A Heuristic-Based Evolutionary Approach for Joint Optimization of Job Shop Scheduling and Facility Layout

被引:0
|
作者
Xu, Wei [1 ]
Wan, Yi [2 ]
机构
[1] Sanjiang Univ, Sch Mech & Elect Engn, Nanjing 210012, Peoples R China
[2] Nanjing Xiaozhuang Univ, Sch Environm Sci, Nanjing 211171, Peoples R China
来源
IEEE ACCESS | 2024年 / 12卷
基金
中国博士后科学基金;
关键词
Job shop scheduling problem; facility layout problem; ant colony system; genetic programming; dispatching rule; ANT COLONY OPTIMIZATION; VARIABLE NEIGHBORHOOD SEARCH; PARTICLE SWARM OPTIMIZATION; DISPATCHING RULES; ALGORITHM; BENCHMARKS;
D O I
10.1109/ACCESS.2024.3427144
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Job shop scheduling (JSS) aims to arrange the processing sequence of a series of operations to optimize the cost objective. The most common objective is to minimize the makespan without considering the flow time of materials between machines. However, in practical production scenarios, the material flow time directly affects the completion time of operations. Besides, facility layout (FL) is the premise of JSS. FL problem can be stated as assigning a range of production machines into the physical environment of the shop floor, which largely determines the time cost of material flow between machines. The result of FL will affect subsequent JSS. Therefore, the FL problem and the JSS problem naturally constitute a two-stage joint optimization problem. So far, the above-mentioned joint optimization problem is rarely studied in the literature because of the complexity of the problem. For this purpose, the joint optimization problem of FL and JSS is defined in this paper, called JSSFLP. Then, a hybrid heuristic evolutionary strategy (HHE) is proposed for solving the proposed JSSFLP. HHE consists of the meta-heuristic, the hyper-heuristic evolutionary algorithm, and the joint optimization mechanism (JOP), Among them, ant colony system (ACS), as a meta-heuristic algorithm, is used to solve the FL problem effectively, and genetic programming (GP), as a hyper-heuristic algorithm, is used to generate rule-based dispatching methods for JSS problem. Besides, JOP, as an adaptor, is designed to coordinate ACS and GP to solve JSSFLP cooperatively. Numerical experiments are conducted to demonstrate the feasibility and effectiveness of the proposed HHE and its component, respectively.
引用
收藏
页码:97630 / 97645
页数:16
相关论文
共 50 条
  • [1] Concurrent Optimization of Job Shop Scheduling and Dynamic and Flexible Facility Layout Planning
    Kamoshida, Ryota
    2018 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2018, : 289 - 293
  • [2] Job-shop scheduling with a combination of evolutionary and heuristic methods
    Pátkai, B
    Torvinen, S
    INTELLIGENT SYSTEMS IN DESIGN AND MANUFACTURING II, 1999, 3833 : 54 - 62
  • [3] A job shop scheduling approach based on simulation optimization
    Yan, Yan
    Wang, Guoxin
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1816 - 1822
  • [4] A novel heuristic approach for job shop scheduling problem
    Wang, Yong-Ming
    Xiao, Nan-Feng
    Yin, Hong-Li
    Hu, En-Liang
    FRONTIERS IN ALGORITHMICS, PROCEEDINGS, 2007, 4613 : 252 - +
  • [5] An evolutionary scheduling scheme based on gkGA approach to the job shop scheduling problem
    Ombuki, BM
    Nakamura, M
    Onaga, K
    IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 1998, E81A (06) : 1063 - 1071
  • [6] mAOR: A heuristic-based reactive repair mechanism for job shop schedules
    Subramaniam, V. (mpesubra@nus.edu.sg), 1600, Springer-Verlag London Ltd (22): : 9 - 10
  • [7] mAOR: A heuristic-based reactive repair mechanism for job shop schedules
    Velusamy Subramaniam
    Amritpal Singh Raheja
    The International Journal of Advanced Manufacturing Technology, 2003, 22 : 669 - 680
  • [8] mAOR: A heuristic-based reactive repair mechanism for job shop schedules
    Subramaniam, V
    Raheja, AS
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 22 (9-10): : 669 - 680
  • [9] On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization
    Kossi P. Adzakpa
    Kondo H. Adjallah
    Farouk Yalaoui
    Journal of Intelligent Manufacturing, 2004, 15 : 131 - 140
  • [10] An Optimization Approach for the Job Shop Scheduling Problem
    Magalhaes-Mendes, Jorge
    RECENT ADVANCES IN APPLIED MATHEMATICS, 2009, : 120 - +