Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana

被引:0
|
作者
Akunyumu, Stephen [1 ]
Fugar, Frank D. K. [1 ]
Adinyira, Emmanuel [1 ]
机构
[1] Kwame Nkrumah Univ Sci & Technol, Dept Construct Technol & Management, Kumasi, Ghana
关键词
International construction joint ventures; Risk management; Risk allocation; Ghana; INFRASTRUCTURE PROJECTS; MANAGEMENT; MODEL; PERCEPTIONS; PERSPECTIVE; STRATEGIES; INDUSTRY; FIRMS;
D O I
10.1108/JFMPC-07-2023-0046
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
PurposeEquitable risk allocation is important for the effective management of inevitable risks in International Construction Joint Venture (ICJV) projects. Previous studies have documented risks facing ICJV projects. However, there is a dearth of studies on the risk allocation preferences that take into consideration the opinions of both the local and foreign partners. This study aims to fill this gap by ascertaining the risk allocation preferences of the partners of ICJV projects for effective risk management.Design/methodology/approachThrough a survey, data on risk allocation preferences were collected from both local and foreign partners of ICJV projects using a comprehensive register of 74 risks.FindingsFollowing analysis, six risks were allocated to the local partner, 11 were allocated to the foreign partner, 51 risks were shared, four were allocated to a third party and two were to be negotiated based on the specific circumstances of the project. Practically, the study's findings will help ICJV partners in drafting their ICJV contracts to adequately allocate risks and reduce contract negotiation time considerably.Practical implicationsThe findings from this study will help partners in drafting their joint venture contract agreement and also reduce the period for contract negotiation. Knowledge of the preferred risk allocation is important in allocating risks in the contract agreement to the relevant partner for effective management.Originality/valueThis study, to the best knowledge of the authors, is one of the early studies to ascertain the risk allocation preferences of ICJV project partners in the Ghanaian construction industry - a departure from previous studies which focused on the identification and evaluation of risks. This study is also different from previous studies by considering the allocation preferences of both partners of the ICJV. The collection of data from both partners of the ICJV helped to consider their perceptions on risk allocation and evaluation, essentially leading to cross-cultural and optimal risk allocation preferences.
引用
收藏
页码:111 / 136
页数:26
相关论文
共 50 条
  • [41] Assessing Interorganizational Relationships Among Key Supply Chain Partners (KSCPs) in Public Construction Projects
    Hadid, Majed
    Gunduz, Murat
    Kwak, Young Hoon
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2024, 71 : 8839 - 8856
  • [42] Research Review on the Relationship Between International Joint Venture's Allocation of Right of Control and Performance
    Qu, Bo
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MANAGEMENT AND ENGINEERING (CME 2014), 2014, : 529 - 535
  • [43] Identifying Political Risk Management Strategies in International Construction Projects
    Chang, Tengyuan
    Hwang, Bon-Gang
    Deng, Xiaopeng
    Zhao, Xianbo
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [44] Critical risk factors in international construction projects An Indian perspective
    Viswanathan, Satish Kumar
    Jha, Kumar Neeraj
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (05) : 1169 - 1190
  • [45] Mapping BIM Uses for Risk Mitigation in International Construction Projects
    Ganbat, Tsenguun
    Chong, Heap-Yih
    Liao, Pin-Chao
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [46] Contractor's risk attitudes in the selection of international construction projects
    Han, SH
    Diekmann, JE
    Ock, JH
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (03): : 283 - 292
  • [47] Risk management model for international construction joint ventures
    Bing, L
    Tiong, RLK
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (05): : 377 - 384
  • [48] Risk management model for international construction joint ventures
    Bing, Li
    Tiong, Robert L. K.
    Journal of Construction Engineering and Management, 125 (05): : 377 - 384
  • [49] Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam
    Nguyen, Tiep
    Nguyen, Long Hoang
    Chileshe, Nicholas
    Hallo, Leonie
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (14) : 2438 - 2451
  • [50] How does local partners network embeddedness affect international joint venture survival in different subnational contexts?
    Kim, Jinsil
    Kim, Kyun
    ASIA PACIFIC JOURNAL OF MANAGEMENT, 2018, 35 (04) : 1055 - 1080