Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana

被引:0
|
作者
Akunyumu, Stephen [1 ]
Fugar, Frank D. K. [1 ]
Adinyira, Emmanuel [1 ]
机构
[1] Kwame Nkrumah Univ Sci & Technol, Dept Construct Technol & Management, Kumasi, Ghana
关键词
International construction joint ventures; Risk management; Risk allocation; Ghana; INFRASTRUCTURE PROJECTS; MANAGEMENT; MODEL; PERCEPTIONS; PERSPECTIVE; STRATEGIES; INDUSTRY; FIRMS;
D O I
10.1108/JFMPC-07-2023-0046
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
PurposeEquitable risk allocation is important for the effective management of inevitable risks in International Construction Joint Venture (ICJV) projects. Previous studies have documented risks facing ICJV projects. However, there is a dearth of studies on the risk allocation preferences that take into consideration the opinions of both the local and foreign partners. This study aims to fill this gap by ascertaining the risk allocation preferences of the partners of ICJV projects for effective risk management.Design/methodology/approachThrough a survey, data on risk allocation preferences were collected from both local and foreign partners of ICJV projects using a comprehensive register of 74 risks.FindingsFollowing analysis, six risks were allocated to the local partner, 11 were allocated to the foreign partner, 51 risks were shared, four were allocated to a third party and two were to be negotiated based on the specific circumstances of the project. Practically, the study's findings will help ICJV partners in drafting their ICJV contracts to adequately allocate risks and reduce contract negotiation time considerably.Practical implicationsThe findings from this study will help partners in drafting their joint venture contract agreement and also reduce the period for contract negotiation. Knowledge of the preferred risk allocation is important in allocating risks in the contract agreement to the relevant partner for effective management.Originality/valueThis study, to the best knowledge of the authors, is one of the early studies to ascertain the risk allocation preferences of ICJV project partners in the Ghanaian construction industry - a departure from previous studies which focused on the identification and evaluation of risks. This study is also different from previous studies by considering the allocation preferences of both partners of the ICJV. The collection of data from both partners of the ICJV helped to consider their perceptions on risk allocation and evaluation, essentially leading to cross-cultural and optimal risk allocation preferences.
引用
收藏
页码:111 / 136
页数:26
相关论文
共 50 条
  • [31] International joint ventures, shareholder returns, venture complexity, and political risk
    Wild, John J.
    Wild, Jonathan M.
    Wild, Kenneth L.
    JOURNAL OF CORPORATE ACCOUNTING AND FINANCE, 2023, 34 (02): : 135 - 148
  • [32] The Influence of Risk Culture on the Performance of International Joint-Venture Securities
    Ma, Xiaoteng
    Tang, Ziyu
    Wang, Dan
    Gao, Hao
    SUSTAINABILITY, 2020, 12 (07)
  • [33] Disputes and dispute resolution systems in Sino-Foreign Joint Venture construction projects in China
    Chan, EHW
    Suen, HCH
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2005, 131 (02) : 141 - 148
  • [34] Modelling the risks faced by Indian construction companies assessing international projects
    Jha, Kumar Neeraj
    Devaya, M. N.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (04) : 337 - 348
  • [35] Assessing the Accuracy of ChatGPT Use for Risk Management in Construction Projects
    Aladag, Hande
    SUSTAINABILITY, 2023, 15 (22)
  • [36] INTERNATIONAL JOINT OPERATION ORGANIZATIONAL STRUCTURE DESIGNS OF INFRASTRUCTURE CONSTRUCTION PROJECTS
    Lumeno, Shirly
    Marzuki, Puti
    Tamin, Rizal
    Sunaryo, Indryati
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 545 - 550
  • [37] Application of fuzzy group analytic hierarchy process in partner selection of international joint venture projects
    Kimiagari, S.
    Keivanpour, S.
    Jolai, F.
    Moazami, M.
    SCIENTIA IRANICA, 2016, 23 (06) : 2959 - 2976
  • [38] Influence of Subcontractor Risk Management on Quality Performance of Building Construction Projects in Ghana
    Adinyira, Emmanuel
    Agyekum, Kofi
    Danku, James Cofie
    Addison, Prince
    Kukah, Augustine Senanu
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2020, 25 (02) : 175 - 197
  • [39] The Risk Allocation Method Based on Fuzzy Integrated Evaluation of Construction Projects
    Gao, Yun-li
    Jiang, Lei
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 428 - 432
  • [40] Risk Allocation in Construction Projects for Government-Linked Company (GLC)
    Ab Rani, Nur Izzati
    Razak, Muhammad Taufiq
    Nusa, Fatin Najwa Mohd
    Isa, Che Maznah Mat
    Mustaffa, Nur Kamaliah
    2020 11TH IEEE CONTROL AND SYSTEM GRADUATE RESEARCH COLLOQUIUM (ICSGRC), 2020, : 265 - 270