Examining the causes and effects of time overruns in construction projects promoted by rural municipalities in Nepal

被引:0
|
作者
Koirala, Madhav Prasad [1 ]
Shahi, Roshan Samrat [2 ]
机构
[1] Sch Engn Pokhara Univ, Sch Engn, Pokhara Metropolitan City 30, Gandaki Provenc, Nepal
[2] Pokhara Univ, Sch Engn, Pokhara, Nepal
关键词
Time overrun; Delay factors; Delay effects; National Competitive Bidding; DELAY;
D O I
10.1016/j.evalprogplan.2024.102436
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
Time overruns are the most common issue in construction projects, which have a significant negative impact on the project and the parties involved. This also applies to National Competitive Bidding (NCB) construction projects in municipalities, jeopardizing project timelines, costs, and quality standards. Poor performance by professionals in rural municipalities has resulted in inadequate infrastructure development in these areas. The goal of this study is to understand the causes and effects of time overruns by employing an exploratory and descriptive research methodology. The data from clients, consultants, and contractors consistently highlights key factors contributing to project delays, including adverse weather conditions, limited involvement from contractor head offices, insufficient consultant experience, inadequate site management, and delays in site mobilization. These delays incur substantial costs related to materials, land acquisition, labor, and market risks. The results included that 52.17% the projects experienced time overruns ranging from 24.4% to 514.71%. Furthermore, 21.73% of projects experienced cost overruns, with the highest at 19.92%. These findings provide critical insights for improving project management and addressing construction time overruns. It recommends conducting national-scale analyses to gain a comprehensive understanding of construction delays and to implement effective mitigation strategies.
引用
收藏
页数:13
相关论文
共 49 条
  • [31] Assessing the Causes and Effects of Delay and Disruption in Construction Projects in Malaysia
    Sohu, S.
    Kassim, Tahara Ramadzan Binti Md
    Mustafa, A.
    Arshad, M. U.
    Nagapan, S.
    JOURNAL OF APPLIED ENGINEERING SCIENCES, 2024, 14 (02) : 336 - 341
  • [32] Analyzing Delays of Road Construction Projects in Cambodia: Causes and Effects
    San Santoso, Djoen
    Soeng, Sothy
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (06)
  • [33] Evaluation and prediction of time overruns in Jordanian construction projects using coral reefs optimization and deep learning methods
    Shihadeh J.
    Al-Shaibie G.
    Bisharah M.
    Alshami D.
    Alkhadrawi S.
    Al-Bdour H.
    Asian Journal of Civil Engineering, 2024, 25 (3) : 2665 - 2677
  • [34] Severity of Time Overrun Causes in Road Construction Projects: Contractors' Perspective
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 191 - 194
  • [35] Time Overrun Causes in construction Projects in Saudi Arabia: Consultants' Perspective
    Mahamid, Ibrahim
    Alhomaydan, Abdullah
    2013 3RD INTERNATIONAL CONFERENCE ON APPLIED SOCIAL SCIENCE (ICASS 2013), VOL 1, 2013, : 114 - 119
  • [36] Identification and Evaluation of Causes and Effects of Change Orders in Building Construction Projects
    Pourrostam, Towhid
    Ismail, Amiruddin
    Mansournejad, Mahmood
    ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2261 - +
  • [37] Analysing delay causes and effects in Ghanaian state housing construction projects
    Amoatey, Charles Teye
    Ameyaw, Yaa Asabea
    Adaku, Ebenezer
    Famiyeh, Samuel
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2015, 8 (01) : 198 - 214
  • [38] EFFECTS OF CONSTRUCTION COST AND VOLUME ON CONSTRUCTION TIME OF EDUCATIONAL PROJECTS IN TEXAS
    Choudhury, Ifte
    2012 ASEE ANNUAL CONFERENCE, 2012,
  • [39] Time and Cost Overrun in Construction Projects in Ecuador: Main Causes and Risk Factors
    Manzano-Alvarado, Mateo
    Montalban-Domingo, Laura
    Garcia-Segura, Tatiana
    Sanz-Benlloch, Amalia
    Pellicer, Eugenio
    CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 238 - 244
  • [40] Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman
    Alnuaimi, Ali S.
    Taha, Ramzi A.
    Al Mohsin, Mohammed
    Al-Harthi, Ali S.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 615 - 622