Performance of a Large-Language Model in scoring construction management capstone design projects

被引:0
|
作者
Castelblanco, Gabriel [1 ]
Cruz-Castro, Laura [2 ]
Yang, Zhenlin [1 ]
机构
[1] Univ Florida, ME Rinker Sr Sch Construct Management, Gainesville, FL 32611 USA
[2] Univ Florida, Dept Engn Educ, Gainesville, FL USA
关键词
capstone course; GPT; LLM; scoring;
D O I
10.1002/cae.22796
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Grading is one of the most relevant hurdles for instructors, diverting instructor's focus on the development of engaging learning activities, class preparation, and attending to students' questions. Institutions and instructors are continuously looking for alternatives to reduce educators' time required on grading, frequently, resulting in hiring teaching assistants whose inexperience and frequent rotation can lead to inconsistent and subjective evaluations. Large Language Models (LLMs) like GPT-4 may alleviate grading challenges; however, research in this field is limited when dealing with assignments requiring specialized knowledge, complex critical thinking, subjective, and creative. This research investigates whether GPT-4's scores correlate with human grading in a construction capstone project and how the use of criteria and rubrics in GPT influences this correlation. Projects were graded by two human graders and three training configurations in GPT-4: no detailed criteria, paraphrased criteria, and explicit rubrics. Each configuration was tested through 10 iterations to evaluate GPT consistency. Results challenge GPT-4's potential to grade argumentative assignments. GPT-4's score correlates slightly better (although poor overall) with human evaluations when no additional information is provided, underscoring the poor impact of the specificity of training materials for GPT scoring in this type of assignment. Despite the LLMs' promises, their limitations include variability in consistency and reliance on statistical pattern analysis, which can lead to misleading evaluations along with privacy concerns when handling sensitive student data. Educators must carefully design grading guidelines to harness the full potential of LLMs in academic assessments, balancing AI's efficiency with the need for nuanced human judgment.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Evaluating large-language-model chatbots to engage communities in large-scale design projects
    Dortheimer, Jonathan
    Martelaro, Nik
    Sprecher, Aaron
    Schubert, Gerhard
    AI EDAM-ARTIFICIAL INTELLIGENCE FOR ENGINEERING DESIGN ANALYSIS AND MANUFACTURING, 2024, 38
  • [42] Cost Management of Large Construction Projects in South Malaysia
    Azis, Ade Asmi Abdul
    Memon, Aftab Hameed
    Rahman, Ismail Abdul
    Latif, Qadir Bux Alias Imran
    Nagapan, Sasitharan
    IEEE SYMPOSIUM ON BUSINESS, ENGINEERING AND INDUSTRIAL APPLICATIONS (ISBEIA 2012), 2012, : 625 - 629
  • [43] The Integrated Management in the Large-Scale Projects' Construction
    Liu, Yisheng
    Bao, Lijia
    Chen, Xu
    LISS 2013, 2015, : 329 - 334
  • [44] Using a systematic engineering design process to conduct undergraduate engineering management capstone projects
    Farr, John V.
    Lee, Marc A.
    Metro, Richard A.
    Sutton, James P.
    Journal of Engineering Education, 2001, 90 (02) : 193 - 197
  • [45] Assessment of Deficiencies in Design Documents for Large Construction Projects
    Assaf, Sadi
    Hassanain, Mohammad A.
    Abdallah, Abdullatif
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2017, 31 (05)
  • [46] An Integrated Risk Management Model for Construction Projects
    Zhao, Zhen-Yu
    Duan, Lin-Ling
    2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1389 - 1394
  • [47] Quality cost management model for construction projects
    Dolacek-Alduk, Zlata
    Radujkovic, Mladen
    Mikulic, Dunja
    GRADEVINAR, 2009, 61 (02): : 147 - 156
  • [48] A Dynamical Model of Program Management on Construction Projects
    Wang Yang
    Liang Zheng
    DATA PROCESSING AND QUANTITATIVE ECONOMY MODELING, 2010, : 212 - 219
  • [49] Risk management system model for construction projects
    Titarenko, Boris
    Hasnaoui, Amir
    Titarenko, Roman
    XXI INTERNATIONAL SCIENTIFIC CONFERENCE ON ADVANCED IN CIVIL ENGINEERING CONSTRUCTION - THE FORMATION OF LIVING ENVIRONMENT (FORM 2018), 2018, 365
  • [50] SEMbeddings: how to evaluate model misfit before data collection using large-language models
    Feraco, Tommaso
    Toffalini, Enrico
    FRONTIERS IN PSYCHOLOGY, 2025, 15