共 50 条
- [1] Study on the influence factors of urban subway project delay in the initial construction stage JOURNAL OF DISCRETE MATHEMATICAL SCIENCES & CRYPTOGRAPHY, 2018, 21 (06): : 1193 - 1197
- [4] Construction risk analysis of urban subway in broken rock strata Electronic Journal of Geotechnical Engineering, 2014, 19 Q : 4189 - 4206
- [6] Construction risk analysis of urban subway in broken rock strata 1600, E-Journal of Geotechnical Engineering (19):
- [7] A Case Study on the Construction Optimization Decision Scheme of Urban Subway Tunnel Based on the TOPSIS Method KSCE Journal of Civil Engineering, 2020, 24 : 3488 - 3500
- [8] STUDY ON CONSTRUCTION INFLUENCE OF SUBWAY ON THE BENEATH RAILWAY BRIDGE NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 868 - 870
- [9] Study on the Influencing Factors of Urban Subway Engineering Construction Safety 2018 3RD INTERNATIONAL CONFERENCE ON BUILDING MATERIALS AND CONSTRUCTION (ICBMC 2018), 2018, 371
- [10] Construction and robustness analysis of urban weighted subway⁃bus composite network Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2022, 52 (11): : 2582 - 2591