Seepage characteristics of core rockfill dam foundation with double cutoff walls in deep overburden: A case study

被引:4
|
作者
Huang, Zhangxin [1 ]
Shen, Zhenzhong [1 ,2 ,3 ]
Xu, Liqun [1 ]
Sun, Yiqing [1 ,2 ]
Li, Haoxuan [1 ]
Liu, Detan [1 ,4 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210024, Peoples R China
[2] Minist Transport, Key Lab Transport Ind Comprehens Transportat Theor, Nanjing Modern Multimodal Transportat Lab, Nanjing 211100, Peoples R China
[3] Hohai Univ, State Key Lab Hydrol Water Resources & Hydraul Eng, Nanjing 210024, Peoples R China
[4] Datang Hydropower Sci & Technol Res Inst Co Ltd, Chengdu 610074, Peoples R China
基金
中国国家自然科学基金;
关键词
High rockfill dam; Deep overburden; Double concrete cutoff walls; Seepage characteristics; Support vector regression; Whale optimization algorithm;
D O I
10.1016/j.cscm.2024.e03576
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Some high rockfill dams, built on deep overburden, utilize double concrete cutoff walls for seepage control, thereby introducing increased complexity to seepage characteristics in the dam foundation. This study focuses on a core rockfill dam located on the Dadu River in China, investigating the impact of dam body and foundation permeability coefficients on the percentages of hydraulic head reduction by the double cutoff walls. A multifactor sensitivity analysis, based on finite element method, is conducted to analyze this influence. Subsequently, an inversion model, integrating support vector regression and whale optimization algorithm, is proposed to identify parameters that align with seepage monitoring data. Results indicate that the permeability coefficients of the surface bedrock and the main grouting curtain exert the most significant influence. Parameters derived from the inversion model yield finite element calculations consistent with monitoring data. Moreover, upstream water level minimally affects the distribution of hydraulic head reduction percentages by the double cutoff walls. And the seepage gradient (G) in the dam foundation overburden remains below the permissible limit, with its relationship to the upstream water level (L) fitted as G = -1.03318 + 6.96E - 4 x L.This study may offer valuable insights for the construction and operational management of similar projects employing double cutoff walls.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Construction Simulation for a Core Rockfill Dam Based on Optimal Construction Stages and Zones: Case Study
    Du, Rongxiang
    Zhong, Denghua
    Yu, Jia
    Tong, Dawei
    Wu, Binping
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2016, 30 (03)
  • [32] Case Study: In Situ Experimental Investigation on Overburden Consolidation Grouting for Columnar Jointed Basalt Dam Foundation
    Dou, Jinxi
    Zhou, Mengxia
    Wang, Zhilin
    Wang, Kexiang
    Yuan, Shui
    Jiang, Mingqiang
    Zhang, Guijin
    GEOFLUIDS, 2020, 2020
  • [33] Dam safety-foundation and seepage problems in existing structures - Kotah Barrage - A case study
    Gopalakrishnan, M
    SYMPOSIUM - REHABILITATION OF DAMS: ICOLD 66TH ANNUAL MEETING, PROCEEDINGS (PT A), 1999, : 105 - 126
  • [34] Study on free vibration characteristics and its scope reflection of Lubuge core-type rockfill dam
    Sui, Feng
    Gu, Ganchen
    Gongye Jianzhu/Industrial Construction, 27 (10): : 10 - 13
  • [35] Study on the elastoplastic damage evolution characteristics of suspended cut-off wall of rockfill dam on ultra-deep overburden during construction and long-term operations
    Peng, Jun
    Zou, Degao
    Qu, Yongqian
    Liu, Jingmao
    Chen, Kai
    ENGINEERING STRUCTURES, 2025, 326
  • [36] Investigating the cause of excessive seepage in a dam foundation using seismic and electrical surveys—a case study of Asa Dam, West Africa
    Wasiu O. Raji
    Khadijat O. Aluko
    Bulletin of Engineering Geology and the Environment, 2021, 80 : 6445 - 6455
  • [37] Investigating seepage flow characteristics with different sealing elements (case study: Lafour dam)
    Kiyoumars Roushangar
    Farhad Amanzadeh
    Hamidreza Abbaszadeh
    John Abraham
    Arabian Journal of Geosciences, 2025, 18 (3)
  • [38] Reduction of Seepage Risks by Investigation into Different Lengths and Positions for Cutoff Wall and Horizontal Drainage (Case Study: Sattarkhan Dam)
    Brontowiyono, Widodo
    Hammid, Ali T.
    Jebur, Yasir M.
    Al-Sudani, Ahmed Q. A. S.
    Mutlak, Dhameer A.
    Parvan, Masoud
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [39] Investigating the cause of excessive seepage in a dam foundation using seismic and electrical surveys-a case study of Asa Dam, West Africa
    Raji, Wasiu O.
    Aluko, Khadijat O.
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (08) : 6445 - 6455
  • [40] Study on the failure characteristics of overburden and the evolution law of seepage field in deep buried thick coal seam under aquifers
    Yang Li
    Xinghai Lei
    Nan Wang
    Yuqi Ren
    Xiangyang Jin
    Guoshuai Li
    Tiezheng Li
    Xiangji Ou
    Natural Hazards, 2023, 118 : 1035 - 1064