Seepage characteristics of core rockfill dam foundation with double cutoff walls in deep overburden: A case study

被引:4
|
作者
Huang, Zhangxin [1 ]
Shen, Zhenzhong [1 ,2 ,3 ]
Xu, Liqun [1 ]
Sun, Yiqing [1 ,2 ]
Li, Haoxuan [1 ]
Liu, Detan [1 ,4 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210024, Peoples R China
[2] Minist Transport, Key Lab Transport Ind Comprehens Transportat Theor, Nanjing Modern Multimodal Transportat Lab, Nanjing 211100, Peoples R China
[3] Hohai Univ, State Key Lab Hydrol Water Resources & Hydraul Eng, Nanjing 210024, Peoples R China
[4] Datang Hydropower Sci & Technol Res Inst Co Ltd, Chengdu 610074, Peoples R China
基金
中国国家自然科学基金;
关键词
High rockfill dam; Deep overburden; Double concrete cutoff walls; Seepage characteristics; Support vector regression; Whale optimization algorithm;
D O I
10.1016/j.cscm.2024.e03576
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Some high rockfill dams, built on deep overburden, utilize double concrete cutoff walls for seepage control, thereby introducing increased complexity to seepage characteristics in the dam foundation. This study focuses on a core rockfill dam located on the Dadu River in China, investigating the impact of dam body and foundation permeability coefficients on the percentages of hydraulic head reduction by the double cutoff walls. A multifactor sensitivity analysis, based on finite element method, is conducted to analyze this influence. Subsequently, an inversion model, integrating support vector regression and whale optimization algorithm, is proposed to identify parameters that align with seepage monitoring data. Results indicate that the permeability coefficients of the surface bedrock and the main grouting curtain exert the most significant influence. Parameters derived from the inversion model yield finite element calculations consistent with monitoring data. Moreover, upstream water level minimally affects the distribution of hydraulic head reduction percentages by the double cutoff walls. And the seepage gradient (G) in the dam foundation overburden remains below the permissible limit, with its relationship to the upstream water level (L) fitted as G = -1.03318 + 6.96E - 4 x L.This study may offer valuable insights for the construction and operational management of similar projects employing double cutoff walls.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Refined analysis on stress state of cutoff wall of high asphaltic core dam on super-deep overburden
    Zou De-gao
    Qu Yong-qian
    Kong Xian-jing
    Chen Kai
    Liu Jing-mao
    Gong Jin
    ROCK AND SOIL MECHANICS, 2023, 44 (06) : 1826 - 1836
  • [22] Effects of spatial difference of ground motion on seismic response of asphalt concrete core wall rockfill dam-overburden foundation system
    Li C.
    Song Z.
    Wang F.
    Liu Y.
    Zhang C.
    Zhendong yu Chongji/Journal of Vibration and Shock, 2022, 41 (19): : 37 - 47
  • [23] Case Study on the Method of Rock Mass Overburden Consolidation Grouting for Dam Foundation
    Dou, Jinxi
    Yang, Xiaolong
    Gong, Pan
    Wang, Zhilin
    Wang, Kexiang
    Zhou, Tiangang
    Zhao, Weiquan
    KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (10) : 4240 - 4249
  • [24] Case Study on the Method of Rock Mass Overburden Consolidation Grouting for Dam Foundation
    Jinxi Dou
    Xiaolong Yang
    Pan Gong
    Zhilin Wang
    Kexiang Wang
    Tiangang Zhou
    Weiquan Zhao
    KSCE Journal of Civil Engineering, 2023, 27 : 4240 - 4249
  • [25] A Study on Three-dimensional Seepage of Dam on the Deep Pervious Fracture Rock Foundation
    Mao Hai-tao
    Wang Xiao-ju
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 1061 - 1064
  • [26] Reliability analysis of service life for ultra-high core-wall rockfill dam considering the seepage-dissolution effect of dam foundation impervious structure
    Zhao, Shaofeng
    Xu, Liqun
    Zhang, Hongwei
    Shen, Zhenzhong
    Liu, Detan
    Gan, Lei
    Shuili Xuebao/Journal of Hydraulic Engineering, 2024, 55 (11): : 1391 - 1403
  • [27] Construction and Monitoring of Cement/Bentonite Cutoff Walls: Case Study of Karkheh Dam, Iran
    Faridmehr, Iman
    YazdaniPour, Mohammad Reza
    Jokar, Mohammad Javadi
    Ozbakkaloglu, Togay
    STUDIA GEOTECHNICA ET MECHANICA, 2019, 41 (04) : 184 - 199
  • [28] Random dynamic response analysis of an asphalt concrete core wall dam on deep overburden with double random factors
    Wang, Zongkai
    Song, Zhiqiang
    Li, Chuang
    Liu, Yunhe
    COMPUTERS AND GEOTECHNICS, 2024, 171
  • [29] Study on Impoundment Deformation Characteristics and Crack of High Core Rockfill Dam Based on Inversion Parameters
    Pan, Litan
    Wu, Bo
    Wang, Daquan
    Zhou, Xiongxiong
    Wang, Lijie
    Zhang, Yi
    WATER, 2024, 16 (01)
  • [30] Stress and deformation characteristics of rock-fill dam with asphalt concrete core wall founded on deep overburden
    Chu, Fu-yong
    Zhu, Jun-gao
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 428 - +