Testing of a Micro Hydro Power Plant Using a Cross-Flow Type Turbine

被引:0
|
作者
Suwasti, Sri [1 ]
Mulyadi, Musrady [1 ]
Klistafani, Yiyin [1 ]
Djalal, Muhammad Ruswandi [1 ]
机构
[1] State Poytech Ujung Pandang, Dept Mech Engn, Makassar, Indonesia
来源
PRZEGLAD ELEKTROTECHNICZNY | 2024年 / 100卷 / 06期
关键词
Testing; Micro Hydro Power Plant; Efficiency; Cross-flow Turbine;
D O I
10.15199/48.2024.06.51
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The implementation of Micro Hydro Power Plants (MHPP) serves as a crucial initiative to address the uneven distribution of electrical energy in remote areas across Indonesia. Before the permanent installation of an MHPP, field testing is imperative, involving the use of a model or prototype to gather location -specific data, assess reliability, and enhance insights into the MHPP's functionality as an electrical energy generator. This research endeavors to comprehend the operation of the Cross -flow turbine MHPP system and ascertain its output power and efficiency. The testing process commences with the design of field test equipment, followed by manufacturing and assembly stages. Subsequently, equipment testing and data collection are conducted, and the obtained data is analyzed to determine the output power and efficiency of the MHPP system utilizing a Cross -flow turbine. The test parameters include water flow, head, turbine input power, generator output power, and overall MHPP system efficiency. Upon analyzing the results and engaging in discussions, it can be concluded that the test considered crucial parameters such as water flow, head, turbine input power, generator output power, and MHPP system efficiency. The highest efficiency recorded was under variable load conditions with a fluctuating discharge of approximately 0.025 m(3) /s, achieving 1.39% efficiency at a load of 80 W. The research findings indicate that variations in head and discharge significantly impact the efficiency of the MHPP system.
引用
收藏
页码:244 / 247
页数:4
相关论文
共 50 条
  • [21] An Experimental Investigation of the Performance of Cross-flow Hydro Turbines
    Verma, Vinay
    Gaba, Vivek Kumar
    Bhowmick, Shubhankar
    POWER AND ENERGY SYSTEMS ENGINEERING, (CPESE 2017), 2017, 141 : 630 - 634
  • [22] Parametric evaluation of cross-flow turbine performance
    Desai, V.R.
    Aziz, N.M.
    Journal of Energy Engineering, 1994, 120 (01) : 17 - 34
  • [23] Study on the draft tube of a cross-flow turbine
    Fukutomi, Jun'ichiro
    Nakase, Yoshiyuki
    Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 1994, 60 (575): : 2459 - 2465
  • [24] Study on an Undershot Cross-Flow Water Turbine
    Yasuyuki Nishi
    Terumi Inagaki
    Yanrong Li
    Ryota Omiya
    Junichiro Fukutomi
    Journal of Thermal Science, 2014, 23 (03) : 239 - 245
  • [25] MODIFICATIONS IN A CROSS-FLOW TURBINE FOR PERFORMANCE IMPROVEMENT
    JOSHI, CB
    SESHADRI, V
    SINGH, SN
    INDIAN JOURNAL OF ENGINEERING AND MATERIALS SCIENCES, 1995, 2 (06) : 261 - 267
  • [26] REFINEMENT OF CROSS-FLOW TURBINE DESIGN PARAMETERS
    TOTAPALLY, HGS
    AZIZ, NM
    JOURNAL OF ENERGY ENGINEERING-ASCE, 1994, 120 (03): : 133 - 147
  • [27] PARAMETRIC STUDY ON PERFORMANCE OF CROSS-FLOW TURBINE
    JOSHI, CB
    SESHADRI, V
    SINGH, SN
    JOURNAL OF ENERGY ENGINEERING-ASCE, 1995, 121 (01): : 28 - 45
  • [28] AN EXPERIMENTAL INVESTIGATION OF CROSS-FLOW TURBINE EFFICIENCY
    DESAI, VR
    AZIZ, NM
    JOURNAL OF FLUIDS ENGINEERING-TRANSACTIONS OF THE ASME, 1994, 116 (03): : 545 - 550
  • [29] Study on an undershot cross-flow water turbine
    Yasuyuki Nishi
    Terumi Inagaki
    Yanrong Li
    Ryota Omiya
    Junichiro Fukutomi
    Journal of Thermal Science, 2014, 23 : 239 - 245
  • [30] Study on an Undershot Cross-Flow Water Turbine
    Nishi, Yasuyuki
    Inagaki, Terumi
    Li, Yanrong
    Omiya, Ryota
    Fukutomi, Junichiro
    JOURNAL OF THERMAL SCIENCE, 2014, 23 (03) : 239 - 245