Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources

被引:3
|
作者
Fekri, Masoud [1 ]
Heydari, Mehdi [1 ]
Mazdeh, Mohammad Mahdavi [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
关键词
Flexible flow shop scheduling; Multi-skilled resource-constrained; Resource idle time; Genetic algorithm; Simulated annealing algorithm; MANUFACTURING CELL; PERMUTATION; ALGORITHM;
D O I
10.1016/j.engappai.2024.108094
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article, a Multi-skilled Resource-Constrained Flexible Flow Shop Scheduling Problem (MSRC-FFSSP) is introduced. To process each job at every machine within this problem category, it is imperative to possess at least one set of multi-skilled human resources. Each human resource can operate a minimum of 1 and a maximum of N jobs depending on their skills and each job requires a minimum set of different skills. For this problem, the model is formulated as a MILP model with two objectives: i) minimizing the total completion time and ii) minimizing the total idle time for human resources. Moreover, a case study in a preventive maintenance environment as a flow shop is performed to establish the applicability of the model in real -world problems. Given that the problem is NP-Hard, a Genetic Algorithm (GA) and a Simulated Annealing (SA) algorithm in which the related parameters are tuned by the Taguchi method are presented. Finally, numerical results have been presented to verify the model, in addition to the analysis of the idle time of human resources. Additionally, to solve this problem, it was shown that the GA has better efficiency and performance compared to the SA algorithm. However, the SA algorithm outperforms the GA in terms of running time.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: Application to the permutation flow shop problem
    Boufellouh, Radhwane
    Belkaid, Faycal
    COMPUTERS & OPERATIONS RESEARCH, 2020, 122
  • [42] Solving a Multi-Objective Mathematical Model for a Multi-Skilled Project Scheduling Problem by CPLEX Solver
    Kia, Reza
    Shahnazari-Shahrezaei, Parisa
    Zabihi, Sina
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 1220 - 1224
  • [43] A bi-objective re-entrant permutation flow shop scheduling problem: minimizing the makespan and maximum tardiness
    Fasihi, Maedeh
    Tavakkoli-Moghaddam, Reza
    Jolai, Fariborz
    OPERATIONAL RESEARCH, 2023, 23 (02)
  • [44] A bi-objective re-entrant permutation flow shop scheduling problem: minimizing the makespan and maximum tardiness
    Maedeh Fasihi
    Reza Tavakkoli-Moghaddam
    Fariborz Jolai
    Operational Research, 2023, 23
  • [45] Bi-objective Optimization for Joint Production Scheduling and Distribution Problem with Sustainability
    Yagmur, Ece
    Kesen, Saadettin Erhan
    COMPUTATIONAL LOGISTICS (ICCL 2021), 2021, 13004 : 269 - 281
  • [46] Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects
    Yi Sun
    Chaoyong Zhang
    Liang Gao
    Xiaojuan Wang
    The International Journal of Advanced Manufacturing Technology, 2011, 55 : 723 - 739
  • [47] Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem
    Doan, M. P.
    Fondrevelle, J.
    Botta-Genoulaz, V
    Ribeiro, J. F. F.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (05) : 1650 - 1665
  • [48] Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects
    Sun, Yi
    Zhang, Chaoyong
    Gao, Liang
    Wang, Xiaojuan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (5-8): : 723 - 739
  • [49] Artificial bee colony algorithm for solving a bi-objective job shop scheduling problem
    Zhang R.
    Advances in Information Sciences and Service Sciences, 2011, 3 (08): : 319 - 326
  • [50] Bi-objective partial flexible job shop scheduling problem: NSGA-II, NRGA, MOGA and PAES approaches
    Rabiee, M.
    Zandieh, M.
    Ramezani, P.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (24) : 7327 - 7342