Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources

被引:3
|
作者
Fekri, Masoud [1 ]
Heydari, Mehdi [1 ]
Mazdeh, Mohammad Mahdavi [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
关键词
Flexible flow shop scheduling; Multi-skilled resource-constrained; Resource idle time; Genetic algorithm; Simulated annealing algorithm; MANUFACTURING CELL; PERMUTATION; ALGORITHM;
D O I
10.1016/j.engappai.2024.108094
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article, a Multi-skilled Resource-Constrained Flexible Flow Shop Scheduling Problem (MSRC-FFSSP) is introduced. To process each job at every machine within this problem category, it is imperative to possess at least one set of multi-skilled human resources. Each human resource can operate a minimum of 1 and a maximum of N jobs depending on their skills and each job requires a minimum set of different skills. For this problem, the model is formulated as a MILP model with two objectives: i) minimizing the total completion time and ii) minimizing the total idle time for human resources. Moreover, a case study in a preventive maintenance environment as a flow shop is performed to establish the applicability of the model in real -world problems. Given that the problem is NP-Hard, a Genetic Algorithm (GA) and a Simulated Annealing (SA) algorithm in which the related parameters are tuned by the Taguchi method are presented. Finally, numerical results have been presented to verify the model, in addition to the analysis of the idle time of human resources. Additionally, to solve this problem, it was shown that the GA has better efficiency and performance compared to the SA algorithm. However, the SA algorithm outperforms the GA in terms of running time.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    Moradi, E.
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (06) : 7169 - 7178
  • [32] A new hybrid multi-objective Pareto archive PSO algorithm for a bi-objective job shop scheduling problem
    Tavakkoli-Moghaddam, R.
    Azarkish, M.
    Sadeghnejad-Barkousaraie, A.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (09) : 10812 - 10821
  • [33] Flexible Job Shop Scheduling Problem Based on Multi-Objective Optimization Algorithm
    Zhang, Li
    Wang, Lu
    PROCEEDINGS OF THE 2018 INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC, CONTROL AND AUTOMATION ENGINEERING (MECAE 2018), 2018, 149 : 580 - 588
  • [34] Gravitational Search Algorithm Optimization for Bi-Objective Flow Shop Scheduling using Weighted Dispatching Rules
    Lee, T. S.
    Loong, Y. T.
    Moslemipour, G.
    2017 7TH IEEE INTERNATIONAL CONFERENCE ON CONTROL SYSTEM, COMPUTING AND ENGINEERING (ICCSCE), 2017, : 127 - 132
  • [35] A Fuzzy Multi-Objective Tabu-Search Method for a New Bi-Objective Open Shop Scheduling Problem
    Seraj, O.
    Tavakkoli-Moghaddam, R.
    Jolai, F.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 164 - 169
  • [36] A bi-objective scheduling optimization of job shop (ID: 6-055)
    Liu Xiaoxia
    Xie Liyang
    Cui Jingwei
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-5: INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION IN NEW-ERA, 2006, : 2417 - 2420
  • [37] Multi-objective flexible flow shop batch scheduling problem with renewable energy
    Wu, Xiuli
    Xiao, Xiao
    Cui, Qi
    INTERNATIONAL JOURNAL OF AUTOMATION AND CONTROL, 2020, 14 (5-6) : 519 - 553
  • [38] Bi-objective job shop scheduling with outsourcing options
    Guo, Xiuping
    Lei, Deming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (13) : 3832 - 3841
  • [39] Research on Bi-objective Scheduling of Dual-Resource Constrained Flexible Job Shop
    Liu, Xiaoxia
    Liu, Chunbo
    Tao, Ze
    MECHATRONICS AND INTELLIGENT MATERIALS, PTS 1 AND 2, 2011, 211-212 : 1091 - +
  • [40] A multi-objective electromagnetism algorithm for a bi-objective flowshop scheduling problem
    Khalili, Majid
    Tavakkoli-Moghaddam, Reza
    JOURNAL OF MANUFACTURING SYSTEMS, 2012, 31 (02) : 232 - 239