Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources

被引:3
|
作者
Fekri, Masoud [1 ]
Heydari, Mehdi [1 ]
Mazdeh, Mohammad Mahdavi [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
关键词
Flexible flow shop scheduling; Multi-skilled resource-constrained; Resource idle time; Genetic algorithm; Simulated annealing algorithm; MANUFACTURING CELL; PERMUTATION; ALGORITHM;
D O I
10.1016/j.engappai.2024.108094
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article, a Multi-skilled Resource-Constrained Flexible Flow Shop Scheduling Problem (MSRC-FFSSP) is introduced. To process each job at every machine within this problem category, it is imperative to possess at least one set of multi-skilled human resources. Each human resource can operate a minimum of 1 and a maximum of N jobs depending on their skills and each job requires a minimum set of different skills. For this problem, the model is formulated as a MILP model with two objectives: i) minimizing the total completion time and ii) minimizing the total idle time for human resources. Moreover, a case study in a preventive maintenance environment as a flow shop is performed to establish the applicability of the model in real -world problems. Given that the problem is NP-Hard, a Genetic Algorithm (GA) and a Simulated Annealing (SA) algorithm in which the related parameters are tuned by the Taguchi method are presented. Finally, numerical results have been presented to verify the model, in addition to the analysis of the idle time of human resources. Additionally, to solve this problem, it was shown that the GA has better efficiency and performance compared to the SA algorithm. However, the SA algorithm outperforms the GA in terms of running time.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Bi-objective optimization for Scheduling and Multi-skilled Worker Assignments in the Hybrid Flow Shop
    Liu, Ming
    Yang, Xuenan
    IFAC PAPERSONLINE, 2019, 52 (13): : 2128 - 2133
  • [2] Bi-objective Genetic Algorithm for Heterogeneous Multi-Skilled Human Resources Assignment and Project Scheduling
    Li, Ming
    Zhou, Ying
    2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, MSE 2015, 2015, : 232 - 238
  • [3] Two-objective optimization of preventive maintenance orders scheduling as a multi-skilled resource- constrained flow shop problem
    Fekri, Masoud
    Heydari, Mehdi
    Mazdeh, Mohammad Mahdavi
    DECISION SCIENCE LETTERS, 2023, 12 (01) : 41 - 54
  • [4] A simheuristic for bi-objective stochastic permutation flow shop scheduling problem
    Maria Gonzalez-Neira, Eliana
    Rafael Montoya-Torres, Jairo
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (02) : 57 - 80
  • [5] A bi-objective optimization for flow shop group scheduling problem with sequence dependent setup time
    Sekkal, Djazia Nadjat
    Belkaid, Faycal
    2022 14TH INTERNATIONAL COLLOQUIUM OF LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA2022), 2022, : 560 - 566
  • [6] Bi-Objective Optimization of a Flow Shop Scheduling Problem Under Time-of-Use Tariffs
    Wang, Xinyue
    Chu, Feng
    Ren, Tao
    Bai, Danyu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024,
  • [7] A clustering search metaheuristic for the bi-objective flexible job shop scheduling problem
    Altoe, Wagner A. S.
    Bissoli, Dayan de C.
    Mauri, Geraldo R.
    Amaral, Andre R. S.
    2018 XLIV LATIN AMERICAN COMPUTER CONFERENCE (CLEI 2018), 2018, : 158 - 166
  • [8] An Immune-PSO Algorithm for Bi-objective Flow Shop Scheduling Problem
    Chang Junlin
    Liang Junyan
    Wei Wei
    2011 30TH CHINESE CONTROL CONFERENCE (CCC), 2011, : 2115 - 2118
  • [9] Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements
    Seif, Javad
    Yu, Andrew Junfang
    Rahmanniyay, Fahimeh
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (09) : 3204 - 3225
  • [10] A bi-objective model for scheduling of multiple projects under multi-skilled workforce for distributed load energy usage
    Shima Javanmard
    Behrouz Afshar-Nadjafi
    Seyed Taghi Akhavan Niaki
    Operational Research, 2022, 22 : 2245 - 2280