Simulation-based hybrid genetic algorithms for the stochastic multi-mode resource-constrained project scheduling problem with minimized financial risk

被引:2
|
作者
Liu, Wanlin [1 ]
Zhang, Haotian [1 ]
Chen, Yumeng [1 ]
Qu, Chunli [1 ,3 ]
Zhang, Jingwen [2 ]
机构
[1] Sichuan Agr Univ, Sch Architecture & Urban Rural Planning, Chengdu 611830, Peoples R China
[2] Northwestern Polytech Univ, Sch Management, Xian 710072, Peoples R China
[3] Sch Architecture & Urban Rural Planning, 288 Jianshe Rd, Chengdu 611830, Sichuan, Peoples R China
关键词
Stochastic multi-mode project scheduling; Conditional net present value at risk; Simulation-based hybrid genetic algorithms; NET PRESENT VALUE; CASH FLOWS; OPTIMIZATION; UNCERTAINTY; NETWORKS; MAXIMIZE;
D O I
10.1016/j.asoc.2024.111716
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Projects face uncertainties during implementation, and these uncertainties often lead to risk factors that disrupt successful project execution and cause a loss of profit. The stochastic project scheduling technique has been an effective avenue for reducing the risks in project management. Nevertheless, previous studies often neglected resource limits for minimizing the financial risks of projects in stochastic project scheduling problems. This study aims to optimize the conditional net present value at risk (CNPVaR), which measures a project's expected loss of net present value (NPV) in a stochastic multi-mode resource-constrained project scheduling problem (SMRCPSP). Accordingly, considering the stochastic activity duration and cash flow, we construct a scenario-based optimization model for the SMRCPSP, where the solution (strategy) of the SMRCPSP is represented by a policy that includes an activity list and execution mode list; a scheduling policy is then employed to map the start times of activities at each decision time based on the solution. Three simulation-based hybrid genetic algorithms embedded with different iteration alternatives according to activity-based (AB) or resource-based (RB) scheduling policies are used. Furthermore, computational experiments are conducted to evaluate the proposed procedures through 480 instances. With respect to the CNPVaR, expected NPV, and algorithm stability metrics, the results of the experiments demonstrate that the genetic algorithm (GA) with local search based on the RB scheduling policy performed best compared with two other hybrids of the GA, the existing vibration damping optimization (VDO) method and a pure GA for large-sized projects. However, the VDO outperforms the other approaches according to the AB scheduling policy for small-scale projects. Additionally, a case study is conducted; the findings demonstrate that the risk attitude (confidence level) of project managers and the discount factor have impacts on the CNPVaR and expected NPV, but the CNPVaR is insensitive to the number of simulations.
引用
收藏
页数:20
相关论文
共 50 条
  • [31] A genetic algorithm-based method for solving multi-mode resource-constrained project scheduling problem in uncertain environment
    Khalilzadeh, Mohammad
    Hosseini, Seyyed Hajir
    Ghaeli, Reza
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 79 - 86
  • [32] An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (02) : 449 - 460
  • [33] A simulation-based approximate dynamic programming approach to dynamic and stochastic resource-constrained multi-project scheduling problem
    Satic, U.
    Jacko, P.
    Kirkbride, C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 454 - 469
  • [34] A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem
    Fernandes Muritiba, Albert Einstein
    Rodrigues, Carlos Diego
    da Costa, Franciio Araujo
    COMPUTERS & OPERATIONS RESEARCH, 2018, 92 : 145 - 154
  • [35] An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
    Messelis, Tommy
    De Causmaecker, Patrick
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 233 (03) : 511 - 528
  • [36] A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
    Kuehn, Mathias
    Dirkmann, Sebastian
    Voelker, Michael
    Schmidt, Thorsten
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 521 - 526
  • [37] Generalized Benders decomposition-based matheuristics for the multi-mode resource-constrained project scheduling problem
    Ramos, Alfredo S.
    Miranda-Gonzalez, Pablo A.
    Olivares-Benitez, Elias
    Mendoza, Abraham
    OPTIMIZATION AND ENGINEERING, 2025,
  • [38] A note on "a genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem"
    Han, Yi
    Cai, Jianhu
    Kaku, Ikou
    Lin, Huazhen
    Ye, Xuhong
    Guo, Haidong
    NUMBERS, INTELLIGENCE, MANUFACTURING TECHNOLOGY AND MACHINERY AUTOMATION, 2012, 127 : 527 - +
  • [39] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [40] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617