Simulation-based hybrid genetic algorithms for the stochastic multi-mode resource-constrained project scheduling problem with minimized financial risk

被引:2
|
作者
Liu, Wanlin [1 ]
Zhang, Haotian [1 ]
Chen, Yumeng [1 ]
Qu, Chunli [1 ,3 ]
Zhang, Jingwen [2 ]
机构
[1] Sichuan Agr Univ, Sch Architecture & Urban Rural Planning, Chengdu 611830, Peoples R China
[2] Northwestern Polytech Univ, Sch Management, Xian 710072, Peoples R China
[3] Sch Architecture & Urban Rural Planning, 288 Jianshe Rd, Chengdu 611830, Sichuan, Peoples R China
关键词
Stochastic multi-mode project scheduling; Conditional net present value at risk; Simulation-based hybrid genetic algorithms; NET PRESENT VALUE; CASH FLOWS; OPTIMIZATION; UNCERTAINTY; NETWORKS; MAXIMIZE;
D O I
10.1016/j.asoc.2024.111716
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Projects face uncertainties during implementation, and these uncertainties often lead to risk factors that disrupt successful project execution and cause a loss of profit. The stochastic project scheduling technique has been an effective avenue for reducing the risks in project management. Nevertheless, previous studies often neglected resource limits for minimizing the financial risks of projects in stochastic project scheduling problems. This study aims to optimize the conditional net present value at risk (CNPVaR), which measures a project's expected loss of net present value (NPV) in a stochastic multi-mode resource-constrained project scheduling problem (SMRCPSP). Accordingly, considering the stochastic activity duration and cash flow, we construct a scenario-based optimization model for the SMRCPSP, where the solution (strategy) of the SMRCPSP is represented by a policy that includes an activity list and execution mode list; a scheduling policy is then employed to map the start times of activities at each decision time based on the solution. Three simulation-based hybrid genetic algorithms embedded with different iteration alternatives according to activity-based (AB) or resource-based (RB) scheduling policies are used. Furthermore, computational experiments are conducted to evaluate the proposed procedures through 480 instances. With respect to the CNPVaR, expected NPV, and algorithm stability metrics, the results of the experiments demonstrate that the genetic algorithm (GA) with local search based on the RB scheduling policy performed best compared with two other hybrids of the GA, the existing vibration damping optimization (VDO) method and a pure GA for large-sized projects. However, the VDO outperforms the other approaches according to the AB scheduling policy for small-scale projects. Additionally, a case study is conducted; the findings demonstrate that the risk attitude (confidence level) of project managers and the discount factor have impacts on the CNPVaR and expected NPV, but the CNPVaR is insensitive to the number of simulations.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] A Hybrid Method for the Multi-Mode Resource-Constrained Project Scheduling Problem with Strip Packing like Resource Constraints
    Szendroi, E.
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [22] Resource-constrained project scheduling: a heuristic for the multi-mode case
    Heilmann, R
    OR SPEKTRUM, 2001, 23 (03) : 335 - 357
  • [23] Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling
    Joanna Józefowska
    Marek Mika
    Rafał Różycki
    Grzegorz Waligóra
    Jan Węglarz
    Annals of Operations Research, 2001, 102 : 137 - 155
  • [24] Simulated annealing for multi-mode resource-constrained project scheduling
    Józefowska, J
    Mika, M
    Rózycki, R
    Waligóra, G
    Weglarz, J
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 137 - 155
  • [25] Modelling and Solving Multi-mode Resource-Constrained Project Scheduling
    Szeredi, Ria
    Schutt, Andreas
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2016, 2016, 9892 : 483 - 492
  • [26] Estimation of Distribution Algorithms for the Multi-Mode Resource Constrained Project Scheduling Problem
    Ayodele, Mayowa
    McCall, John
    Regnier-Coudert, Olivier
    2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 1579 - 1586
  • [27] A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
    Van Peteghem, Vincent
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 201 (02) : 409 - 418
  • [28] RETRACTED: A Heuristic Genetic Algorithm for Multi-Mode Resource-Constrained Project Scheduling Problem (Retracted Article)
    Li Zheng
    Qin Jinlei
    Zhang Changming
    ICCSIT 2010 - 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 3, 2010, : 582 - 585
  • [29] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Vincent Van Peteghem
    Mario Vanhoucke
    Journal of Heuristics, 2011, 17 : 705 - 728
  • [30] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Van Peteghem, Vincent
    Vanhoucke, Mario
    JOURNAL OF HEURISTICS, 2011, 17 (06) : 705 - 728