The Continuous Time-Resource Trade-off Scheduling Problem with Time Windows

被引:0
|
作者
Artigues, Christian [1 ]
Hebrard, Emmanuel [1 ]
Quilliot, Alain [2 ,3 ]
Toussaint, Helene [2 ,3 ]
机构
[1] Univ Toulouse, Lab Anal & Architecture Syst, Ctr Natl Rech Sci, F-31031 Toulouse, France
[2] Ctr Natl Rech Sci, Lab Informat Modelisat & Optimisat Syst, F-63178 Clermont Ferrand, France
[3] Univ Clermont Auvergne, F-63178 Clermont Ferrand, France
基金
欧盟地平线“2020”;
关键词
continuous time-resource trade-off scheduling; time windows; complexity; mixed-integer linear programming; branch and cut; insertion heuristic; evacuation planning;
D O I
10.1287/ijoc.2022.0142
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We introduce a variant of the cumulative scheduling problem (CuSP) characterized by continuous modes, time windows, and a criterion that involves safety margin maximization. The study of this variant is motivated by the Geospatial based Environment for Optimisation Systems Addressing Fire Emergencies Horizon 2020 Project, which is devoted to the design of evacuation plans in the face of natural disasters and more specifically, wildfire. People and goods have to be transferred from endangered places to safe places, and evacuation planning consists of scheduling evacuee moves along precomputed paths under arc capacities and deadlines. The resulting model is relevant in other contexts, such as project or industrial process scheduling. We consider here several formulations of the continuous time -resource trade-off scheduling problem (CTRTP-TW) with a safety maximization objective. We establish a complete complexity characterization distinguishing polynomial and NP -hard special cases depending on key parameters. We show that the problem with fixed sequencing (i.e., with predetermined overlap or precedence relations between activities) is convex. We then show that the preemptive variant is polynomial, and we propose lower and upper bounds based on this relaxation. A flow -based mixed -integer linear programming formulation is presented, from which a branch -and -cut exact method and an insertion heuristic are derived. An exact dedicated branch -andbound algorithm is also designed. Extensive computational experiments are carried out to compare the different approaches on evacuation planning instances and on general CTRTP-TW instances. The experiments also show the interest of the continuous model compared with a previously proposed discrete approximation.
引用
收藏
页码:1676 / 1695
页数:21
相关论文
共 50 条
  • [31] Time preference bias in time trade-off
    Van Der Pol M.
    Roux L.
    The European Journal of Health Economics, 2005, 6 (2) : 107 - 111
  • [32] Flexible Resource-constrained Discrete Time-cost Trade-off Problem Considering Resource Transfer
    Zou, Haobo
    Zhou, Guohua
    JOURNAL OF INTERNET TECHNOLOGY, 2021, 22 (01): : 197 - 207
  • [33] Scheduling jobs with time-resource tradeoff via nonlinear programming
    Grigoriev, Alexander
    Uetz, Marc
    DISCRETE OPTIMIZATION, 2009, 6 (04) : 414 - 419
  • [34] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [35] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [36] Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process
    Sadri, Shadi
    Ghomi, S. M. T. Fatemi
    Dehghanian, Amin
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 535 - 568
  • [37] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [38] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [39] Scheduling parallel CNC machines with time/cost trade-off considerations
    Gurel, Sinan
    Akturk, M. Selim
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (09) : 2774 - 2789
  • [40] A computer Time Trade-Off: a feasible and reliable alternative for the interview Time Trade-Off in rheumatoid arthritis
    Buitinga, L.
    Braakman-Jansen, L. M. A.
    Taal, E.
    van de Laar, M. A. F. J.
    CLINICAL AND EXPERIMENTAL RHEUMATOLOGY, 2011, 29 (05) : 783 - 789