Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process

被引:1
|
作者
Sadri, Shadi [1 ]
Ghomi, S. M. T. Fatemi [1 ]
Dehghanian, Amin [2 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn, 424 Hafez Ave, Tehran 1591634311, Iran
[2] Georgia Inst Technol, H Milton Stewart Sch Ind & Syst Engn, 755 Ferst Dr NW, Atlanta, GA 30332 USA
关键词
Time-cost trade-off problem; GERT networks; Resource-constrained project scheduling; Markov decision process; Semi-Markov decision process; OPTIMIZATION MODELS; ALGORITHM;
D O I
10.1007/s10479-024-05896-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Nowadays the advent of new types of projects such as startups, maintenance, and education make a revolution in project management, so that, classical project scheduling methods are incapable in analyzing of these stochastic projects. This study considers a time-cost trade-off project scheduling problem, where the structure of the project is uncertain. To deal with the uncertainties, we implemented Graphical Evaluation and Review Technique (GERT). The main aim of the study is to balance time and the amount of a non-renewable resource allocated to each activity considering the finite-time horizon and resource limitations. To preserve the generality of the model, we considered both discrete and continuous distribution functions for the activity's duration. From a methodological standpoint, we proposed an analytical approach based on the Markov Decision Process (MDP) and Semi-Markov Decision Process (SMDP) to find the probability distribution of project makespan. These models are solved using the value iteration and a finite-horizon Linear Programming (LP) model. Two randomly generated examples explain the value iteration for models in detail. Furthermore, seven example groups each with five instances are adopted from a well-known data set, PSPLIB, to validate the efficiency of the proposed models in contrast to the two extensively-studied methods, Genetic algorithm (GA) and Monte-Carlo simulation. The convergence of the GA and simulation results to those of MDP and SMDP represent the efficiency of the proposed models. Besides, conducting a sensitivity analysis on the project completion probability with respect to the available resource, gives a good insight to managers to plan their resources.
引用
收藏
页码:535 / 568
页数:34
相关论文
共 50 条
  • [41] Process flow scheduling as a resource-constrained project planning problem
    Trautmann, N
    OPERATIONS RESEARCH PROCEEDINGS 1999, 2000, : 491 - 496
  • [42] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [43] CBO and CSS Algorithms for Resource Allocation and Time-Cost Trade-Off
    Kaveh, Ali
    Khanzadi, Mostafa
    Alipour, Majid
    Naraky, Mohammad Rajabi
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2015, 59 (03): : 361 - 371
  • [44] Time-Cost Trade-off Problems of Engineering Project with Running Income
    Li, Hongxian
    Ouyang, Hongxiang
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 9 - +
  • [45] Modeling project time-cost trade-off in fuzzy random environment
    Ke, Hua
    Ma, Junjie
    APPLIED SOFT COMPUTING, 2014, 19 : 80 - 85
  • [46] Project time-cost trade-off optimization by maximal flow theory
    Liu, JM
    Rahbar, F
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) : 607 - 609
  • [47] A FLOW-PRESERVING ALGORITHM FOR THE TIME-COST TRADE-OFF PROBLEM
    TUFEKCI, S
    IIE TRANSACTIONS, 1982, 14 (02) : 109 - 113
  • [48] A Risk Minimization Model for a Multi-Skilled, Multi-Mode Resource-Constrained Project Scheduling Problem with Discrete Time-Cost-Quality-Risk Trade-Off
    Polancos, Ronaldo V.
    Seva, Rosemary R.
    ENGINEERING MANAGEMENT JOURNAL, 2024, 36 (03) : 272 - 288
  • [49] Time-cost trade-off in a multi-choice assignment problem
    Singh, Shalabh
    Singh, Sonia
    ENGINEERING OPTIMIZATION, 2022, 54 (04) : 576 - 592
  • [50] A fuzzy time-cost trade-off problem with credibility theory concepts
    Ke, Hua
    Ma, Weimin
    PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262