Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process

被引:1
|
作者
Sadri, Shadi [1 ]
Ghomi, S. M. T. Fatemi [1 ]
Dehghanian, Amin [2 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn, 424 Hafez Ave, Tehran 1591634311, Iran
[2] Georgia Inst Technol, H Milton Stewart Sch Ind & Syst Engn, 755 Ferst Dr NW, Atlanta, GA 30332 USA
关键词
Time-cost trade-off problem; GERT networks; Resource-constrained project scheduling; Markov decision process; Semi-Markov decision process; OPTIMIZATION MODELS; ALGORITHM;
D O I
10.1007/s10479-024-05896-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Nowadays the advent of new types of projects such as startups, maintenance, and education make a revolution in project management, so that, classical project scheduling methods are incapable in analyzing of these stochastic projects. This study considers a time-cost trade-off project scheduling problem, where the structure of the project is uncertain. To deal with the uncertainties, we implemented Graphical Evaluation and Review Technique (GERT). The main aim of the study is to balance time and the amount of a non-renewable resource allocated to each activity considering the finite-time horizon and resource limitations. To preserve the generality of the model, we considered both discrete and continuous distribution functions for the activity's duration. From a methodological standpoint, we proposed an analytical approach based on the Markov Decision Process (MDP) and Semi-Markov Decision Process (SMDP) to find the probability distribution of project makespan. These models are solved using the value iteration and a finite-horizon Linear Programming (LP) model. Two randomly generated examples explain the value iteration for models in detail. Furthermore, seven example groups each with five instances are adopted from a well-known data set, PSPLIB, to validate the efficiency of the proposed models in contrast to the two extensively-studied methods, Genetic algorithm (GA) and Monte-Carlo simulation. The convergence of the GA and simulation results to those of MDP and SMDP represent the efficiency of the proposed models. Besides, conducting a sensitivity analysis on the project completion probability with respect to the available resource, gives a good insight to managers to plan their resources.
引用
收藏
页码:535 / 568
页数:34
相关论文
共 50 条
  • [31] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [32] A new approach to solve time-cost trade-off problem with fuzzy decision variables
    Ghazanfari, M.
    Yousefli, A.
    Ameli, M. S. Jabal
    Bozorgi-Amiri, A.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4): : 408 - 414
  • [33] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects
    Gülçağ Albayrak
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307
  • [34] THE TIME-COST TRADE-OFF ANALYSIS IN CONSTRUCTION PROJECT USING COMPUTER SIMULATION AND INTERACTIVE PROCEDURE
    Blaszczyk, Tomasz
    Nowak, Maciej
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2009, 15 (04) : 523 - 539
  • [35] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126
  • [36] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [37] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [38] Network analysis algorithm for the solution of discrete time-cost trade-off problem
    Önder Halis Bettemir
    M. Talat Birgönül
    KSCE Journal of Civil Engineering, 2017, 21 : 1047 - 1058
  • [39] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [40] Network Analysis Algorithm for the Solution of Discrete Time-Cost Trade-off Problem
    Bettemir, Onder Halis
    Birgonul, M. Talat
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1047 - 1058