Impact Analysis on Existing High-speed Railway Tunnel by the Construction of New Tunnel-Overpass

被引:0
|
作者
Pan Wei-dong [1 ]
Chen Jian-gang [1 ]
Ou Wen-jun [2 ]
机构
[1] South China Univ Technol, Sch Civil Engn & Transportat, Guangzhou 510641, Guangdong, Peoples R China
[2] China Railway 12Th Bur Grp, Engn Co LTD 4, Xian 710000, Shaanxi, Peoples R China
来源
关键词
cross project; numerical simulation; net distance; cross angle;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In order to study the influence of the deformation and stress of the existing tunnel structure under different distance and cross angles, the actual project in Fuzhou city was taken to analyze. The finite element analysis software was used to construct the three-dimensional finite element model for numerical calculation, and obtained a variation curves of vertical displacement and stress at different distances and angles. Numerical results show that: (1) When the distance is 1.5 times less than the diameter of the new tunnel, the maximum vertical deformation of the existing tunnel occurs at the intersection of the two tunnels. When the distance is 1.5 times more than the diameter of the new tunnel, the maximum deformation of the existing tunnel is gradually moving toward the center of the existing tunnel. (2) The influence of the first principal stress and the deformation of the existing tunnel is mainly affected by the distance, and the cross angle has little effect. May the research results can provide some reference for the design and construction of similar projects.
引用
收藏
页码:5627 / 5639
页数:13
相关论文
共 50 条
  • [31] Underwater Acoustic Characteristics of High-Speed Railway Subsea Tunnel
    Hou, Bowen
    Zeng, Qine
    Li, Jiajing
    JOURNAL OF COASTAL RESEARCH, 2020, : 43 - 46
  • [32] Research of Train Wind Characteristics in High-Speed Railway Tunnel
    Fei, Ruizhen
    Peng, Limin
    Yang, Weichao
    Yan, Weiguang
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 865 - 868
  • [33] Influence of blockage ratio on slipstreams in a high-speed railway tunnel
    Li, Wenhui
    Liu, Tanghong
    Martinez-Vazquez, Pedro
    Chen, Zhengwei
    Huo, Xiaoshuai
    Guo, Zijian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 115
  • [34] Propagation characteristics of compression wave in a high-speed railway tunnel
    Iyer, Rohit Sankaran
    Kim, Dong Hyeon
    Kim, Heuy Dong
    PHYSICS OF FLUIDS, 2021, 33 (08)
  • [35] Research and optimization of tunnel construction scheme for super-large span high-speed railway tunnel in poor tuff strata
    Ma, Jianfei
    He, Shaohui
    Liu, Xiabing
    He, Jiaxin
    APPLIED RHEOLOGY, 2023, 33 (01)
  • [36] Analysis of Settlement Caused by Tunnel underneath Existing Railway after Construction
    Xu, Zepei
    Li, Xibing
    MATERIALS, TRANSPORTATION AND ENVIRONMENTAL ENGINEERING, PTS 1 AND 2, 2013, 779-780 : 534 - 537
  • [38] THE INFORMATION CONSTRUCTION MANAGEMENT ABOUT INITIAL SUPPORT OF HIGH-SPEED RAILWAY TUNNEL IN LOESS REGION
    Hu, Shimin
    Zhang, Dingli
    LISS 2011: PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCE, VOL 3, 2011, : 155 - 158
  • [39] Research on construction time of secondary lining of large section loess tunnel for high-speed railway
    Lu Jun-fu
    Wang Ming-nian
    Jia Yuan-yuan
    Yu Yu
    Tan Zhong-sheng
    ROCK AND SOIL MECHANICS, 2011, 32 (03) : 843 - 848
  • [40] Aerodynamic effects of subgrade-tunnel transition on high-speed railway by wind tunnel tests
    Zhang, Jingyu
    Zhang, Mingjin
    Li, Yongle
    Fang, Chen
    WIND AND STRUCTURES, 2019, 28 (04) : 203 - 213