共 50 条
- [42] Conceptual framework of knowledge sharing and project team performance relationship in design and build project 3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING (ICCEE 2019), 2020, 419
- [46] Direct and indirect effects of team reflections on knowledge sharing and acquisition in project teams IFKAD 2017: 12TH INTERNATIONAL FORUM ON KNOWLEDGE ASSET DYNAMICS: KNOWLEDGE MANAGEMENT IN THE 21ST CENTURY: RESILIENCE, CREATIVITY AND CO-CREATION, 2017, : 474 - 487
- [48] Team of A-Teams for Solving the Resource-Constrained Project Scheduling Problem ADVANCES IN KNOWLEDGE-BASED AND INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, 2012, 243 : 1201 - 1210
- [49] The Discourse of Design: Examining students' perceptions of design in multidisciplinary project teams 2014 ASEE ANNUAL CONFERENCE, 2014,
- [50] Assessing the impact of leadership, team building, and team member characteristics in creating high performance project teams ENGINEERING MANAGEMENT: IT'S ABOUT PEOPLE, PROCEEDINGS, 2001, : 92 - 101