A NOVEL STRATEGY FOR BERTH AND QUAY CRANE ALLOCATION UNDER DISRUPTION IN CONTAINER TERMINAL

被引:0
|
作者
Yang, Jie [1 ]
Gao, Hong [2 ]
Liu, Wei [2 ]
Liu, Tao [3 ]
机构
[1] Dalian Maritime Univ, Transportat Management Coll, 1 Linghai Rd, Dalian 116026, Peoples R China
[2] Dalian Maritime Univ, Dept Math, 1 Linghai Rd, Dalian 116026, Peoples R China
[3] North Univ China, Sch Comp Sci & Control Engn, 3 Xueyuan Rd, Taiyuan 030051, Peoples R China
关键词
Berth and quay crane allocation; Disruption; Container terminal; Stablen mode;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The port operational plan which is optimized before the vessel arrives tends to be disrupted by some uncertainties. And the pre-arranged scheduling plan will be not optimal or even infeasible. In this paper, we focus on the integrated berth and quay crane allocation under disruption. First, an initial allocation model is formulated without taking account of the disruption. Second, a simulation-based strategy is proposed to deal with disruptions. Vessels' berthing times and berthing positions are constrained within stable modes which are extracted through multiple disruption simulations. Under these constraints, a mixed integer linear programming model is presented to solve the integrated berth and quay crane allocation problem. Furthermore, an efficient method is presented to determine the specific quay cranes which serve a vessel. Additionally, four experimental scenarios are designed and conducted on several test instances to validate the performance of the proposed strategy. This strategy proves to be viable. It not only better maintains the stability of the initial scheduling plan but also prevents excessive use of port resources.
引用
收藏
页码:1535 / 1551
页数:17
相关论文
共 50 条
  • [31] A Genetic Algorithm for Berth Allocation and Quay Crane Assignment
    Rodriguez-Molins, Mario
    Barber, Federico
    Sierra, Maria R.
    Puente, Jorge
    Salido, Miguel A.
    ADVANCES IN ARTIFICIAL INTELLIGENCE - IBERAMIA 2012, 2012, 7637 : 601 - 610
  • [32] Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey
    Rodrigues, Filipe
    Agra, Agostinho
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (02) : 501 - 524
  • [33] Behavior perception-based disruption models for berth allocation and quay crane assignment problems
    Liu, Changchun
    Zheng, Li
    Zhang, Canrong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 97 : 258 - 275
  • [34] Discretization-Strategy-Based Solution for Berth Allocation and Quay Crane Assignment Problem
    Tang, Min
    Ji, Bin
    Fang, Xiaoping
    Yu, Samson S.
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (04)
  • [35] Berth allocation and quay crane assignment in a container terminal for the trade-off between time-saving and energy-saving
    He, Junliang
    ADVANCED ENGINEERING INFORMATICS, 2016, 30 (03) : 390 - 405
  • [36] Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
    Chargui, Kaoutar
    Zouadi, Tarik
    El Fallahi, Abdellah
    Reghioui, Mohamed
    Aouam, Tarik
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 154
  • [37] Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost
    Jiang, Meixian
    Feng, Jiajia
    Zhou, Jian
    Zhou, Lin
    Ma, Fangzheng
    Wu, Guanghua
    Zhang, Yuqiu
    SUSTAINABILITY, 2023, 15 (06)
  • [38] Solving the Continuous Berth Allocation and Specific Quay Crane Assignment Problems with Quay Crane Coverage Range
    Li, Feng
    Sheu, Jiuh-Biing
    Gao, Zi-You
    TRANSPORTATION SCIENCE, 2015, 49 (04) : 968 - 989
  • [39] Berth and quay crane allocation: a moldable task scheduling model
    Blazewicz, J.
    Cheng, T. C. E.
    Machowiak, M.
    Oguz, C.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (07) : 1189 - 1197
  • [40] A genetic algorithm for robust berth allocation and quay crane assignment
    Rodriguez-Molins M.
    Ingolotti L.
    Barber F.
    Salido M.A.
    Sierra M.R.
    Puente J.
    Progress in Artificial Intelligence, 2014, 2 (4) : 177 - 192