Cut-off wall construction using Cutter Soil Mixing: a case study

被引:14
|
作者
Arnold, Michael [1 ]
Beckhaus, Karsten [2 ]
Wiedenmann, Ulli [2 ]
机构
[1] Tech Univ Dresden, Inst Geotechn Engn, D-01062 Dresden, Germany
[2] Bauer Spezialtiefbau GmbH, D-86529 Schrobenhausen, Germany
关键词
D O I
10.1002/gete.201000021
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Cutter Soil Mixing (CSM), a deep soil mixing method, was used to rehabilitate the Herbert Hoover Dike, Florida by installing a cutoff wall. After an introduction to the method including remarks on its advantages and limitations, the rehabilitation project and its background are presented. The paper describes the necessary approach to apply Cutter Soil Mixing under the specific site conditions. Finally, results obtained from an extensive testing program are discussed.
引用
收藏
页码:11 / 21
页数:11
相关论文
共 50 条
  • [31] Lead adsorption and transport in loess-amended soil-bentonite cut-off wall
    Wang, Yuze
    Chen, Yunmin
    Xie, Haijian
    Zhang, Chunhua
    Zhan, Liangtong
    ENGINEERING GEOLOGY, 2016, 215 : 69 - 80
  • [32] Equivalent circuit model study of mixing diode with cut-off frequency of 5 THz
    Feng, Zhihong (ga917vv@163.com), 2016, Chinese Society of Astronautics (45):
  • [33] Quality control of Cutter Soil Mixing (CSM) technology - a case study
    Bellato, D.
    Simonini, P.
    Grisolia, M.
    Leder, E.
    Marzano, I. P.
    CHALLENGES AND INNOVATIONS IN GEOTECHNICS: PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 1, 2013, : 495 - 498
  • [34] Optimization of reservoir cut-off parameters: a case study in SW Iran
    Mahbaz, SeyedBijan
    Sardar, Hadi
    Namjouyan, Mehdi
    Mirzaahmadian, Yaser
    PETROLEUM GEOSCIENCE, 2011, 17 (04) : 355 - 363
  • [35] Durability assessment of a confinement cut-off wall for a phosphogypsum landfill
    Fratalocchi, E.
    Pasqualini, E.
    Balboni, P.
    Mozzi, R.
    PROCEEDINGS OF THE 16TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOLS 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 2257 - 2260
  • [36] Application of plastic concrete cut-off wall in reinforcement of reservoir
    Wang, L.
    Huang, Y.
    Li, Z.
    Zhang, J.
    2020 3RD INTERNATIONAL CONFERENCE OF GREEN BUILDINGS AND ENVIRONMENTAL MANAGEMENT, 2020, 531
  • [37] Research on effect of suspended cut-off wall with simulation test
    Wang, Baotian
    Chen, Xi'an
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2008, 27 (SUPPL.): : 2766 - 2771
  • [38] The Applications Of Concrete Cut-Off Wall In The Reinforcement Of The Earth Dam
    Li, Jinglong
    Li, Shucai
    Li, Shuchen
    ADVANCES IN COMPOSITES, PTS 1 AND 2, 2011, 150-151 : 749 - 752
  • [39] Study on the Construction Method and Effects of Ipsilateral, Multi-Nozzle, High-Pressure Jet Grouting Cut-Off Wall
    Liu, Da
    Xie, Weijiang
    Gao, Jianglin
    Hu, Songtao
    Chen, Ming
    Li, Yan
    Li, Linhua
    SUSTAINABILITY, 2022, 14 (16)
  • [40] Construction of the deep cut-off at the Walter F George dam
    di Cervia, AR
    GEO-SUPPORT 2004: DRILLED SHAFTS, MICROPILING, DEEP MIXING, REMEDIAL METHODS, AND SPECIALTY FOUNDATION SYSTEMS, 2004, (124): : 530 - 544