Development of a Model for the Optimal Test Scheduling Considering Multiple Products

被引:0
|
作者
Son, Hong-Rok [2 ]
Ryu, Jun-Hyung [1 ]
Lee, In-Beum [2 ]
机构
[1] Dongguk Univ, Dept Energy & Environm Syst, 707 Seokjang Dong, Gyeongju Si 780714, Gyeongbuk, South Korea
[2] POSTECH, Dept Chem Engn, Pohang Si 790784, Gyeongbuk, South Korea
来源
KOREAN CHEMICAL ENGINEERING RESEARCH | 2009年 / 47卷 / 06期
关键词
New Product Development; Multiple Product; Resource Constrained;
D O I
暂无
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
As a rule, when develop new product in company, multiple products that have similar function are developed simultaneously. These products are subjected to a group of tests covering quality, safety and durability. If the schedule of tests is changed, the expected net presented value(NPV) of new products is changed. The tests should be scheduled with the goal of maximizing the expected NPV of the new products. A model incorporated resource constraints with the sequencing of testing tasks of multiple products is proposed in this paper. Examples show that the proposed model can handle stochastic task duration data represented by scenarios with probabilities.
引用
收藏
页码:695 / 699
页数:5
相关论文
共 50 条
  • [41] Optimal scheduling of power systems considering demand response
    Zhaohong BIE
    Haipeng XIE
    Guowei HU
    Gengfeng LI
    JournalofModernPowerSystemsandCleanEnergy, 2016, 4 (02) : 180 - 187
  • [42] Optimal scheduling of power systems considering demand response
    Bie, Zhaohong
    Xie, Haipeng
    Hu, Guowei
    Li, Gengfeng
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2016, 4 (02) : 180 - 187
  • [43] Coordinated Scheduling Model with Multiple Time Scales Considering Response Uncertainty of Flexible Load
    Zhao D.
    Song Y.
    Wang Y.
    Yin J.
    Xu C.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (22): : 21 - 30
  • [44] Optimal Scheduling of Imaging Missions for Multiple Satellites Using Linear Programming Model
    Selewondim Eshetu Ayana
    Hae-Dong Kim
    International Journal of Aeronautical and Space Sciences, 2023, 24 : 559 - 569
  • [45] Optimal Scheduling of Imaging Missions for Multiple Satellites Using Linear Programming Model
    Ayana, Selewondim Eshetu
    Kim, Hae-Dong
    INTERNATIONAL JOURNAL OF AERONAUTICAL AND SPACE SCIENCES, 2023, 24 (02) : 559 - 569
  • [46] A Multi-Source Coordinated Optimal Scheduling Model Considering Wind-Load Uncertainty
    Zhao, Dongmei
    Wang, Haoxiang
    Tao, Ran
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2022, 37 (03): : 707 - 718
  • [47] A stochastic optimal scheduling of multi-microgrid systems considering emissions: A chance constrained model
    Aghdam, Farid Hamzeh
    Kalantari, Navid Taghizadegan
    Mohammadi-Ivatloo, Behnam
    JOURNAL OF CLEANER PRODUCTION, 2020, 275 (275)
  • [48] Abandoned Wind Consumptive Optimal Scheduling Model Considering Load Demand and latent heat storage
    Zhang, Hongyu
    Zhao, Qingqi
    Kong, Yanyan
    Yan, Chunsheng
    Wang, Hao
    Yang, Yi
    Zheng, Wen
    2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 2333 - 2338
  • [49] Reliability assessment model considering heterogeneous population in a multiple stresses accelerated test
    Lin, Kunsong
    Chen, Yunxia
    Xu, Dan
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 165 : 134 - 143
  • [50] OPTIMAL CONFIGURATION AND SCHEDULING OF GROUNDWATER TRACER TEST
    CLEVELAND, TG
    YEH, WW
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1991, 117 (01): : 37 - 51