Development of a Model for the Optimal Test Scheduling Considering Multiple Products

被引:0
|
作者
Son, Hong-Rok [2 ]
Ryu, Jun-Hyung [1 ]
Lee, In-Beum [2 ]
机构
[1] Dongguk Univ, Dept Energy & Environm Syst, 707 Seokjang Dong, Gyeongju Si 780714, Gyeongbuk, South Korea
[2] POSTECH, Dept Chem Engn, Pohang Si 790784, Gyeongbuk, South Korea
来源
KOREAN CHEMICAL ENGINEERING RESEARCH | 2009年 / 47卷 / 06期
关键词
New Product Development; Multiple Product; Resource Constrained;
D O I
暂无
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
As a rule, when develop new product in company, multiple products that have similar function are developed simultaneously. These products are subjected to a group of tests covering quality, safety and durability. If the schedule of tests is changed, the expected net presented value(NPV) of new products is changed. The tests should be scheduled with the goal of maximizing the expected NPV of the new products. A model incorporated resource constraints with the sequencing of testing tasks of multiple products is proposed in this paper. Examples show that the proposed model can handle stochastic task duration data represented by scenarios with probabilities.
引用
收藏
页码:695 / 699
页数:5
相关论文
共 50 条
  • [31] Optimal Model for Local Energy Community Scheduling Considering Peer to Peer Electricity Transactions
    Faia, Ricardo
    Soares, Joao
    Pinto, Tiago
    Lezama, Fernando
    Vale, Zita
    Corchado, Juan Manuel
    IEEE ACCESS, 2021, 9 : 12420 - 12430
  • [32] Study on optimal model of the BRT operation scheduling considering passengers transferring from subway
    Wu, Jia-Qing
    Song, Rui
    Lin, Zheng
    Li, Shu-Bin
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2014, 14 (01): : 150 - 157
  • [33] AN OPTIMAL FORMULATION FOR TEST SCHEDULING NETWORK-ON-CHIP USING MULTIPLE CLOCK RATES
    Salamy, Hassan
    Harmanani, Haidar M.
    2011 24TH CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (CCECE), 2011, : 215 - 218
  • [34] A novel optimal accelerated degradation test design method considering multiple decision variables
    Wang, Zhihua
    Liu, Gen
    Li, Wenbo
    Wu, Qiong
    Li, Junxing
    Liu, Chengrui
    MICROELECTRONICS RELIABILITY, 2021, 124
  • [35] Economic Scheduling of Gaseous-liquid Hydrogen Generation and Storage Plants Considering Complementarity of Multiple Products
    Zhang, Jiamei
    Sun, Kai
    Li, Canbing
    Liu, Hui
    Huang, Wentao
    Zhou, Bin
    Hou, Xiaochao
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2023, 11 (01) : 223 - 233
  • [36] Economic Scheduling of Gaseous-liquid Hydrogen Generation and Storage Plants Considering Complementarity of Multiple Products
    Jiamei Zhang
    Kai Sun
    Canbing Li
    Hui Liu
    Wentao Huang
    Bin Zhou
    Xiaochao Hou
    Journal of Modern Power Systems and Clean Energy, 2023, 11 (01) : 223 - 233
  • [37] Electricity optimal scheduling strategy considering multiple parks shared energy in the absence of grid power supply
    Jiang, Youhua
    Yang, Jinwan
    Wang, Chunji
    Cao, Yilong
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2020, 30 (12):
  • [38] Optimal Scheduling of Integrated Energy System Considering Electric Vehicle Battery Swapping Station and Multiple Uncertainties
    Bian, Haihong
    Ren, Quance
    Guo, Zhengyang
    Zhou, Chengang
    WORLD ELECTRIC VEHICLE JOURNAL, 2024, 15 (04):
  • [39] Optimal scheduling of products with common and unique components
    Liao, CJ
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1996, 27 (04) : 361 - 366
  • [40] Optimal Design of an Island Microgrid with Considering Scheduling Optimization
    Huang, Meixian
    Fu, Lijun
    Zhang, Yan
    Gao, Xueping
    2017 INTERNATIONAL SMART CITIES CONFERENCE (ISC2), 2017,