Development of a Model for the Optimal Test Scheduling Considering Multiple Products

被引:0
|
作者
Son, Hong-Rok [2 ]
Ryu, Jun-Hyung [1 ]
Lee, In-Beum [2 ]
机构
[1] Dongguk Univ, Dept Energy & Environm Syst, 707 Seokjang Dong, Gyeongju Si 780714, Gyeongbuk, South Korea
[2] POSTECH, Dept Chem Engn, Pohang Si 790784, Gyeongbuk, South Korea
来源
KOREAN CHEMICAL ENGINEERING RESEARCH | 2009年 / 47卷 / 06期
关键词
New Product Development; Multiple Product; Resource Constrained;
D O I
暂无
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
As a rule, when develop new product in company, multiple products that have similar function are developed simultaneously. These products are subjected to a group of tests covering quality, safety and durability. If the schedule of tests is changed, the expected net presented value(NPV) of new products is changed. The tests should be scheduled with the goal of maximizing the expected NPV of the new products. A model incorporated resource constraints with the sequencing of testing tasks of multiple products is proposed in this paper. Examples show that the proposed model can handle stochastic task duration data represented by scenarios with probabilities.
引用
收藏
页码:695 / 699
页数:5
相关论文
共 50 条
  • [1] Development of Scenario-Based Models for Optimal Test Scheduling Considering Retest and Outsourcing
    Son, Hong-Rok
    Ryu, Jun-Hyung
    Lee, In-Beum
    JOURNAL OF CHEMICAL ENGINEERING OF JAPAN, 2009, 42 (05) : 330 - 337
  • [2] Optimal Scheduling of Refined Products Pipelines with Multiple Sources
    Cafaro, Diego C.
    Cerda, Jaime
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (14) : 6675 - 6689
  • [3] Optimal Scheduling of Multiple Load Aggregators with Considering Satisfaction Index
    Xu, Weifeng
    Yu, Bin
    Weng, Liguo
    Zhu, Xiaowei
    Huang, Yuan
    Zheng, Wen
    2022 IEEE/IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (I&CPS ASIA 2022), 2022, : 1573 - 1579
  • [4] Optimal pumping scheduling model considering reservoir evaporation
    Reca, Juan
    Garcia-Manzano, Alfonso
    Martinez, Juan
    AGRICULTURAL WATER MANAGEMENT, 2015, 148 : 250 - 257
  • [5] A multiple chance-constrained model for optimal scheduling of microgrids considering normal and emergency operation
    Sefidgar-Dezfouli, Ali
    Joorabian, Mahmood
    Mashhour, Elaheh
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 112 : 370 - 380
  • [6] CONSIDERING MULTIPLE FAILURE MECHANISMS IN OPTIMAL TEST DESIGN
    Grundler, Alexander
    Dazer, Martin
    Herzig, Thomas
    Bertsche, Bernd
    7TH INTERNATIONAL CONFERENCE INTEGRITY-RELIABILITY-FAILURE (IRF2020), 2020, : 673 - 682
  • [7] Combinational Scheduling Model Considering Multiple Vehicle Sizes
    Gong, Liang
    Li, Yinzhen
    Xu, Dejie
    SUSTAINABILITY, 2019, 11 (19) : 1 - 14
  • [8] Intelligent optimal scheduling strategy of IES with considering the multiple flexible loads
    Li, Qiuwen
    Mo, Dong
    Kong, Xiangyun
    Lu, Yufu
    Liang, Yangdou
    Liang, Zhencheng
    ENERGY REPORTS, 2023, 9 : 1983 - 1994
  • [9] Intelligent optimal scheduling strategy of IES with considering the multiple flexible loads
    Li, Qiuwen
    Mo, Dong
    Kong, Xiangyun
    Lu, Yufu
    Liang, Yangdou
    Liang, Zhencheng
    ENERGY REPORTS, 2023, 9 : 1983 - 1994
  • [10] OPTIMAL SCHEDULING OF WATER NETWORK REPAIR CREWS CONSIDERING MULTIPLE OBJECTIVES
    Osman, Hesham
    Ammar, Marwan
    El-Said, Moheeb
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (01) : 28 - 36