A FLOWSHOP PROBLEM WITH SEQUENCE-DEPENDENT ADDITIVE SETUP TIMES

被引:0
|
作者
SZWARC, W [1 ]
GUPTA, JND [1 ]
机构
[1] BALL STATE UNIV,MUNCIE,IN 47306
关键词
D O I
10.1002/1520-6750(198710)34:5<619::AID-NAV3220340503>3.0.CO;2-B
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:619 / 627
页数:9
相关论文
共 50 条
  • [31] Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times
    Lin, Shih-Wei
    Ying, Kuo-Ching
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (04) : 474 - 496
  • [32] ASSEMBLY LINE BALANCING PROBLEM WITH STOCHASTIC SEQUENCE-DEPENDENT SETUP TIMES
    Diri, Zulal
    Mete, Suleyman
    Cil, Zeynel Abidin
    Agpak, Kursad
    PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2015, 21 (04): : 152 - 157
  • [33] General flowshop scheduling problem with the sequence dependent setup times: A heuristic approach
    Ziaee, Mohsen
    INFORMATION SCIENCES, 2013, 251 : 126 - 135
  • [34] Single machine scheduling problem with stochastic sequence-dependent setup times
    Ertem, Mehmet
    Ozcelik, Feristah
    Sarac, Tugba
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3273 - 3289
  • [35] An MBO Algorithm for a Flow Shop Problem with Sequence-Dependent Setup Times
    Sioud, Aymen
    Gagne, Caroline
    PROCEEDINGS OF THE 2016 12TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2016, : 2471 - 2474
  • [36] Heuristics for the mixed no-idle flowshop with sequence-dependent setup times and total flowtime criterion
    Rossi, Fernando Luis
    Nagano, Marcelo Seido
    EXPERT SYSTEMS WITH APPLICATIONS, 2019, 125 : 40 - 54
  • [37] Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
    Lin, Shih-Wei
    Gupta, Jatinder N. D.
    Ying, Kuo-Ching
    Lee, Zne-Jung
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (12) : 3205 - 3217
  • [38] A discrete multi-objective fireworks algorithm for flowshop scheduling with sequence-dependent setup times
    He, Lijun
    Li, Wenfeng
    Zhang, Yu
    Cao, Yulian
    SWARM AND EVOLUTIONARY COMPUTATION, 2019, 51
  • [39] Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
    Behnamian, J.
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (05) : 1415 - 1438
  • [40] A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times
    Nagano, Marcelo Seido
    Miyata, Hugo Hissashi
    Araujo, Daniella Castro
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 224 - 230