CLIENT-CONTRACTOR RELATIONSHIP - MUTUAL METAPHORS

被引:0
|
作者
BIDDER, J
机构
来源
关键词
D O I
10.1016/0167-188X(80)90012-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:2 / 6
页数:5
相关论文
共 50 条
  • [41] Ranking the benefits of early contractor involvement: a client's perspective
    Ishtiaque, Tausif Ahmed
    Wondimu, Paulos Abebe
    Memic, Nadina
    Andersen, Bjorn Sorskot
    Laedre, Ola
    Klakegg, Ole Jonny
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [42] Study of payment scheduling problem to achieve client–contractor agreement
    Farzad Bahrami
    Ghasem Moslehi
    The International Journal of Advanced Manufacturing Technology, 2013, 64 : 497 - 511
  • [43] Client attitude to health and safety - A report on contractor's perceptions
    Musonda, Innocent
    Haupt, Theo
    Smallwood, John
    ACTA STRUCTILIA, 2009, 16 (02) : 69 - 85
  • [44] USAID-CONTRACTOR RELATIONSHIP
    AVANT, G
    PUBLIC ADMINISTRATION REVIEW, 1969, 29 (05) : 560 - 561
  • [45] The Impact of a Client Contractor Health and Safety (H&S) Programme on Contractor H&S Performance
    Smallwood, John
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 996 - 1002
  • [46] The Impact of Contractor-Client Network Structure on Building Project Quality
    Liu, Huimin
    Fu, Lin
    Kwak, Young Hoon
    Ning, Yan
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2024, 71 : 12932 - 12945
  • [47] ENVIRONMENTAL-REGULATIONS AFFECT BOTH CONTRACTOR AND CLIENT IN TIME, MONEY
    BRUMMER, T
    OIL & GAS JOURNAL, 1982, 80 (13) : 115 - &
  • [48] The effect of client and type and size of construction work on a contractor's bidding
    Drew, D
    Skitmore, M
    Lo, HP
    BUILDING AND ENVIRONMENT, 2001, 36 (03) : 393 - 406
  • [49] Owner/contractor alliance - A case study to improve mutual profitability
    Leich, DC
    Cowan, DA
    FIRST IEE/IMECHE INTERNATIONAL CONFERENCE ON POWER STATION MAINTENANCE - PROFITABILITY THROUGH RELIABILITY, 1998, (452): : 101 - 105
  • [50] Contractor-client compromised solution for project optimum cost and duration
    Khosrowshahi, F
    ADVANCES IN CONCURRENT ENGINEERING: CE97, 1997, 97 : 525 - 530