共 50 条
- [42] Study of payment scheduling problem to achieve client–contractor agreement The International Journal of Advanced Manufacturing Technology, 2013, 64 : 497 - 511
- [45] The Impact of a Client Contractor Health and Safety (H&S) Programme on Contractor H&S Performance CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 996 - 1002
- [49] Owner/contractor alliance - A case study to improve mutual profitability FIRST IEE/IMECHE INTERNATIONAL CONFERENCE ON POWER STATION MAINTENANCE - PROFITABILITY THROUGH RELIABILITY, 1998, (452): : 101 - 105
- [50] Contractor-client compromised solution for project optimum cost and duration ADVANCES IN CONCURRENT ENGINEERING: CE97, 1997, 97 : 525 - 530