共 50 条
- [32] PRIMARY SECONDARY ASSEMBLY ANALYSIS AS A PLANNING METHOD FOR ASSEMBLY LINES WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1985, 75 (01): : 9 - 14
- [33] SIMPLIFIED METHOD OF MEASURING PRODUCTIVITY IDENTIFIES OPPORTUNITIES FOR INCREASING IT INDUSTRIAL ENGINEERING, 1983, 15 (02): : 49 - &
- [35] PROBABILISTIC ANALYSIS OF STRUCTURAL RELIABILITY AND PRODUCTIVITY OF ASSEMBLY LINE AND AUTOMATED LINE AVTOMATIKA, 1991, (03): : 87 - 93
- [36] Productivity improvement with parallel adjacent U-shaped assembly lines ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2019, 14 (01): : 51 - 64
- [38] Reliability and Efficiency Increasing of the Half-Wave Power Transmission Lines 2018 INTERNATIONAL SCIENTIFIC MULTI-CONFERENCE ON INDUSTRIAL ENGINEERING AND MODERN TECHNOLOGIES (FAREASTCON), 2018,
- [40] Methodical increase of productivity - Increasing productivity by a joint application of VSM and MTM in assembly and production-logistical processes ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2012, 107 (1-2): : 55 - 60