Tower cranes for construction implementations.

被引:0
|
作者
Dahlheim, W
机构
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:585 / 587
页数:3
相关论文
共 50 条
  • [41] New special stops for tower cranes
    Zhukov, V.G.
    Idenbaum, A.I.
    Nevzorov, L.A.
    Bezopasnost' Truda v Promyshlennosti, 2001, (10): : 30 - 32
  • [42] PORTAL, TOWER AND PILLAR CRANES.
    Anon
    American National Standards Institute, Standards, 1973,
  • [43] Dynamic analysis models of tower cranes
    Yu, Lanfeng
    Wang, Jinnuo
    Kim, Michael
    DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 2134 - 2136
  • [44] Location optimization for a group of tower cranes
    Zhang, P.
    Harris, F.C.
    Olomolaiye, P.O.
    Holt, G.D.
    Journal of Construction Engineering and Management, 125 (02): : 115 - 122
  • [45] Operation of tower cranes under limited
    Utkin, A.Ya.
    Mekhanizatsiya Stroitel'stva, 2002, (11): : 11 - 13
  • [46] TOWER CRANES - A FUTURE FULL OF OPTIMISM
    不详
    CIVIL ENGINEERING-LONDON, 1983, (NOV): : 20 - &
  • [47] Use of tower cranes on building sites
    Gradevinar, 1996, 48 (08):
  • [48] VIBRATION CONTROL DEVICES FOR TOWER CRANEs
    de Sebastian-Sanz, Jesus
    Casado-Sanchez, Carlos M.
    Lorenzana-Iban, Antolin
    Poncela-Mendez, Alfonso
    DYNA, 2009, 84 (03): : 237 - 244
  • [49] Tower cranes used for building.
    Wintermeyer
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1914, 58 : 211 - 215
  • [50] Location optimization for a group of tower cranes
    Zhang, P
    Harris, FC
    Olomolaiye, PO
    Holt, GD
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (02): : 115 - 122