Outsourcing prioritized warranty repairs

被引:15
|
作者
Buczkowski, Peter [1 ]
Hartmann, Mark [1 ]
Kulkarni, Vidyadhar [1 ]
机构
[1] Univ N Carolina, Dept Stat & Operat Res, Chapel Hill, NC 27515 USA
关键词
Warranties; Outsourcing; Resource allocation;
D O I
10.1108/02656710510610848
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - To consider the problem of outsourcing warranty repairs to outside vendors when items have priorities in service. Design/methodology/approach - The repair allocation problem is formulated as a convex minimum- cost network flow problem and solve it by the successive shortest path algorithm. The computation issues involved with the problem are also discussed. Findings - Examples are provided to illustrate the cost benefits achieved due to the priority structure. Research limitations/implications - The research uses a closed static allocation model. Future research efforts can expand our model by considering a dynamic allocation method or an open population model. Practical implications - The paper can be a valuable resource to warranty managers who make decisions regarding the negotiations of warranty contracts and the allocation of items to outside repair vendors. Originality/value - A warranty manager can apply our results to receive insight on the value of giving priority in service to special customers. In addition, resource allocation problems with an objective structure similar to our application can be efficiently solved using our algorithm.
引用
收藏
页码:699 / +
页数:17
相关论文
共 50 条
  • [21] Manufacturer warranty service outsourcing strategies in a dual-channel supply chain
    Zhang, Yiwen
    He, Zhen
    He, Shuguang
    Cai, Keyuan
    Wang, Dongfan
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2020, 27 (06) : 2899 - 2926
  • [22] Altered quasi-renewal concepts for modeling renewable warranty costs with imperfect repairs
    Park, Minjae
    Pham, Hoang
    MATHEMATICAL AND COMPUTER MODELLING, 2010, 52 (9-10) : 1435 - 1450
  • [23] Taxonomy of candidate's selection for prioritized predictive maintenance in maintenance, repairs and overhaul organizations
    Fedorov, Roman
    Pavlyuk, Dmitry
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2023, 29 (03) : 589 - 605
  • [24] A study of the optimal use period and number of minimal repairs of a repairable product after the warranty expires
    Jhang, JP
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2005, 36 (11) : 697 - 704
  • [25] EXTENDED WARRANTY OF MEDICAL EQUIPMENT SUBJECT TO IMPERFECT REPAIRS: AN APPROACH BASED ON GENERALIZED RENEWAL PROCESS AND STACKELBERG GAME
    Marques de Santana, Joao Mateus
    Velozo Santiago, Rafael Luiz
    Moura, Marcio das Chagas
    Lins, Isis Didier
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2018, 20 (04): : 567 - 578
  • [26] Extended Warranty Policies with Warranty Options
    Rangan, Alagar
    Khiabani, Vahidhossein
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 576 - 580
  • [27] EFFECTS OF WARRANTY EXECUTION ON WARRANTY RESERVE COSTS
    PATANKAR, JG
    MITRA, A
    MANAGEMENT SCIENCE, 1995, 41 (03) : 395 - 400
  • [28] Reinventing warranty at HP: an engineering approach to warranty
    Kakouros, S
    Cargille, B
    Esterman, M
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2003, 19 (01) : 21 - 30
  • [29] "Free replacement extended warranty" or "traditional extended warranty": Optimal extended warranty selection strategy
    Cao, Kaiying
    Su, Yunyi
    Xu, Yuqiu
    Wang, Jia
    MANAGERIAL AND DECISION ECONOMICS, 2022, 43 (07) : 3130 - 3146
  • [30] The Impact of Extended Warranty on Base Warranty: A Game Approach
    Tian, Houping
    Yan, Qingqing
    Liu, Changxian
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 830 - 834