Prediction of IS Project Escalation Based on Software Development Risk Management

被引:1
|
作者
Kim, Eun [1 ]
Park, Yongtae [2 ]
机构
[1] Seoul Natl Univ, Sch Engn, Grad Program Technol & Management, San 56-1, Seoul 151742, South Korea
[2] Seoul Natl Univ, Sch Engn, Dept Ind Engn, Seoul 151742, South Korea
关键词
Information system development project; risk; project escalation;
D O I
10.1142/S0219649207001688
中图分类号
G25 [图书馆学、图书馆事业]; G35 [情报学、情报工作];
学科分类号
1205 ; 120501 ;
摘要
Information system project failure is described as a common phenomenon. Escalation occurs when there are continued commitments for a troubled project and has been observed as one pattern of failure. The main purpose of this research was to investigate whether software development risks were the factors to discriminate between escalated projects and non-escalated projects. Thirty critical risks were selected and classified into nine risk categories under three dimensions such as product, people, and process. Probability and loss in each nine risk category were measured on the basis of 247 survey cases from IS professionals. The results show that the risk probability in the people dimension and the process dimension with management aspects was more important to predict escalation than the risk loss in those dimensions and the risk impact in the product dimension with technical aspects. The results imply that managerial factors are more critical than technical factors in predicting IS development project escalation. Additionally, it was noticed that the CMM level of an organisation was very significant to predict successful projects.
引用
收藏
页码:153 / 163
页数:11
相关论文
共 50 条
  • [41] Cost-sensitive and ensemble-based prediction model for outsourced software project risk prediction
    Hu, Yong
    Feng, Bin
    Mo, Xizhu
    Zhang, Xiangzhou
    Ngai, E. W. T.
    Fan, Ming
    Liu, Mei
    DECISION SUPPORT SYSTEMS, 2015, 72 : 11 - 23
  • [42] Software Project Total Life Cycle Risk Management Model Based on QFD
    Gu Xiao-yan
    Cai Chen
    2008 INTERNATIONAL WORKSHOP ON INFORMATION TECHNOLOGY AND SECURITY, 2008, : 251 - 255
  • [43] A Risk Emergency Management Model for Software Project Based on Stochastic Petri Nets
    Qu, Ying
    Wang, Min
    2015 7th International Conference on Modelling, Identification and Control (ICMIC), 2014, : 687 - 692
  • [44] Automated Intelligent Feedback Based Learning in a Software Development Project Management Course
    Lopez-Jimenez, Juan J.
    Garcia-Berna, Jose A.
    Toval, Ambrosio
    Fernandez-Aleman, Jose L.
    INTERNATIONAL JOURNAL OF ENGINEERING EDUCATION, 2023, 39 (04) : 949 - 960
  • [45] An Information-Entropy-based Risk Measurement Method of Software Development Project
    Jiang, Rong
    JOURNAL OF INFORMATION SCIENCE AND ENGINEERING, 2014, 30 (05) : 1279 - 1301
  • [46] Software Escalation Prediction Based on Deep Learning in the Cognitive Internet of Vehicles
    Wang, Ranran
    Zhang, Yin
    Fortino, Giancarlo
    Guan, Qingxu
    Liu, Jiangchuan
    Song, Jeungeun
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2022, 23 (12) : 25408 - 25418
  • [47] Software development risk management survey
    Apine, B
    INFORMATION SYSTEMS DEVELOPMENT: ADVANCES IN METHODOLOGIES, COMPONENTS AND MANAGEMENT, 2002, : 241 - 251
  • [48] Risk management for collaborative software development
    Mohtashami, Mojgan
    Marlowe, Thomas
    Kirova, Vassilka
    Deek, Fadi P.
    INFORMATION SYSTEMS MANAGEMENT, 2006, 23 (04) : 20 - 30
  • [49] RISK MANAGEMENT APPLIED TO SOFTWARE DEVELOPMENT
    Basso Macedo, Mateus Henrique
    Salgado, Eduardo Gomes
    SISTEMAS & GESTAO, 2015, 10 (01): : 158 - 170
  • [50] AN EVALUATION OF SOFTWARE PROJECT RISK MANAGEMENT IN SOUTH AFRICA
    de Wet, B.
    Visser, J. K.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2013, 24 (01) : 14 - 28