MARION DRAGLINE INSTALLED AT SYNCRUDE

被引:0
|
作者
BRIDGES, L
机构
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
引用
收藏
页码:48 / 48
页数:1
相关论文
共 50 条
  • [31] Syncrude expansion requires keen logistics
    不详
    CIM BULLETIN, 2004, 97 (1078): : 8 - 8
  • [32] 'MARION'
    KAL, J
    MAATSTAF, 1981, 29 (11-1): : 53 - 53
  • [33] 'Marion'
    Signorelli, A
    CINEFORUM, 1997, 37 (09): : 55 - 55
  • [34] Cleaning up - continuous work at Syncrude
    不详
    CIM BULLETIN, 2004, 97 (1081): : 13 - 13
  • [35] Interview with Jim Carter - Syncrude Canada
    Carter, J
    CIM BULLETIN, 1999, 92 (1028): : 28 - 31
  • [36] Maintenance management at Syncrude: Application of Relcode
    Ghosh, N
    E&MJ-ENGINEERING AND MINING JOURNAL, 2000, 201 (08): : 40 - 41
  • [37] Dragline to dump automation
    AusIMM Bulletin, 1997, (06):
  • [38] Spider dragline silk
    Warner, Steven B.
    Polk, Malcolm
    Jacob, Karl
    Journal of Macromolecular Science - Reviews in Macromolecular Chemistry and Physics, 1999, 39 C (04): : 643 - 653
  • [39] Filling of dragline buckets
    CSIRO Div of Mathematical and, Information Sciences, Clayton
    Math Eng Ind, 1 (1-24):
  • [40] Dragline swing automation
    Winstanley, GJ
    Corke, PI
    Roberts, JM
    1997 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION - PROCEEDINGS, VOLS 1-4, 1997, : 1827 - 1832