PROCESS-ORIENTED IMPLEMENTATION OF ENTERPRISE APPLICATIONS

被引:0
|
作者
MEINHARDT, S
机构
来源
WIRTSCHAFTSINFORMATIK | 1995年 / 37卷 / 05期
关键词
OFF-THE-SHELF SOFTWARE; IMPLEMENTATION OF ENTERPRISE APPLICATIONS; PROCEDURE MODEL; BUSINESS PROCESS REENGINEERING (BPR); BUSINESS PROCESSES; REFERENCE MODEL; ENTERPRISE MODEL; CUSTOMIZING;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Many companies are confronting the problem of reorganizing the organizational structure and processes of their organizations and installing the state of the art information technology. The adequate design of business processes plays an essential role in dealing with this problem and in reaching the strived-for business goals of conversion. In this article, the starting point for a business process-oriented introduction of off-the-shelf software will be described in three separate sections: requirement analysis, software implementation and system maintenance. This approach uses a reference model during the :requirement analysis phase as a backdrop for analyzing a company's business processes to create an enterprise model. The implementation phase is then based on this enterprise model. The task- and problem descriptions within the process of implementation make up the focal point of this article.
引用
收藏
页码:487 / 499
页数:13
相关论文
共 50 条
  • [41] Process-oriented Social Research
    Onaka, Fumiya
    COMPARATIVE SOCIOLOGY, 2023, 22 (05) : 635 - 638
  • [42] Process-oriented knowledge structuring
    Mertins, K
    Heisig, P
    Alwert, K
    JOURNAL OF UNIVERSAL COMPUTER SCIENCE, 2003, 9 (06) : 542 - 550
  • [43] A Process-Oriented Modelling Technique
    Damij, Nadja
    Damij, Talib
    UKSIM 2009: ELEVENTH INTERNATIONAL CONFERENCE ON COMPUTER MODELLING AND SIMULATION, 2009, : 134 - 139
  • [44] Measuring process-oriented teaching
    Alivernini, Fabio
    Manganelli, Sara
    Lucidi, Fabio
    3RD WORLD CONFERENCE ON PSYCHOLOGY, COUNSELING AND GUIDANCE, WCPCG-2012, 2013, 84 : 1346 - 1349
  • [45] Process-Oriented Managerial Accounting
    Hrabal, Martin
    INTERNATIONAL ADVANCES IN ECONOMIC RESEARCH, 2016, 22 (02) : 225 - 227
  • [46] A Process-Oriented Small Lake Scheme for Coupled Climate Modeling Applications
    MacKay, Murray D.
    JOURNAL OF HYDROMETEOROLOGY, 2012, 13 (06) : 1911 - 1924
  • [47] Pulmonary artery embolism: Process-oriented and standardized implementation of national and international guidelines
    Pöss J.
    Freund A.
    Vollert J.O.
    Wolfrum S.
    Radke P.
    Möckel M.
    Giannitsis E.
    Hamm C.
    Möckel M.
    Schunkert H.
    Vollert J.
    Der Kardiologe, 2018, 12 (1): : 68 - 82
  • [48] Study on multi-enterprise collaborative resource planning based process-oriented decision model
    Shi Jinhua
    He Yingying
    Liu Jianming
    1ST INTERNATIONAL SYMPOSIUM ON DIGITAL MANUFACTURE, VOLS 1-3, 2006, : 600 - 606
  • [49] Towards a business process-oriented approach to enterprise content management: the ECM-blueprinting framework
    vom Brocke, Jan
    Simons, Alexander
    Cleven, Anne
    INFORMATION SYSTEMS AND E-BUSINESS MANAGEMENT, 2011, 9 (04) : 475 - 496
  • [50] Business process-oriented design of Enterprise Resource Planning (ERP) systems for small and medium enterprises
    Quiescenti, M.
    Bruccoleri, M.
    La Commare, U.
    La Diega, S. Noto
    Perrone, G.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (18-19) : 3797 - 3811