Post-evaluation System in Construction Projects in Gaza Strip-Palestine

被引:0
|
作者
Enshassi, Adnan Ali [1 ]
Arain, Faisal [2 ]
El-Rayyes, Yasmine [1 ]
机构
[1] IUG Civil Engn, Gaza Strip Palestine, Gaza City Gaza, Palestine
[2] Northern Alberta Inst Technol, Sch Sustainable Bldg & Environm Management, Edmonton, AB, Canada
关键词
Construction; Donors; Project success; Post-evaluation;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A construction project can be described as successful when it is completed on time, within budget and according to specifications. Post-evaluation plays a major role in the construction industry when determining whether the project is a success or a failure. The objectives of this paper are as follows: to provide an overview of an organisation's interest in the post-evaluation system of the construction projects in the Gaza Strip, to identify and rank the most important factors used in the post-evaluation system for construction projects, to identify the obstacles of the post-evaluation system and to determine the factors that lead to a successful post-evaluation system. A structured questionnaire was adopted in this study; 40 questionnaires were distributed to international organisations that implemented construction projects in the Gaza Strip. The ordinal data were analysed by the relative important index method, which was used to rank the factors and the groups of the questionnaire and the nominal data were analysed by the relative frequency or percentage. The research findings revealed that international organisations in the Gaza Strip are concerned with the post-evaluation system of construction projects because post-evaluation is required by all donors. Cost, time and quality are found to be the most important group factors for the post-evaluation system of construction projects. The factors that are used in the process of post-evaluation include the following: project efficiency, owner satisfaction, project effectiveness, safety, risks, change orders, resources, communication, procurement and the environment. Overloaded projects were found to be the largest obstacle to the process of post-evaluation. A lack of awareness about post-evaluation will increase the risk of not complying with donor requirements, which affects potential future funding. Evaluator efficiency was found to be the most important factor leading to a successful post-evaluation system. This paper recommends that organisations consider other factors, such as safety and environmental impact. It is advisable to consider risk factors in the evaluation process because the Gaza Strip suffers from political and economic instability and to increase the evaluators' awareness concerning environmental and safety impacts in the evaluation process. The findings from this study would also be valuable for all construction professionals involved in the construction industry in general.
引用
收藏
页码:51 / 73
页数:23
相关论文
共 50 条
  • [41] The Application of Factor Analysis in Construction Project Post-evaluation
    Zhang, Hai Yan
    Zhao, Jin Wei
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 224 - 228
  • [42] Post-evaluation of Construction Agents' Work for Government Investment Projects based on the Variable Weight Synthesizing Theory and AHP
    Wu Yun-na
    Huang Ying-ying
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 8955 - 8959
  • [43] Post-evaluation index system for aero-engine R & D capacity building projects
    Xu, Chunrong
    Ren, Wenjing
    Zhou, Hong
    Xu, Chunrong, 1600, Beijing University of Aeronautics and Astronautics (BUAA) (40): : 1160 - 1164
  • [44] Prevalence and associated factors influencing stunting in children aged 2-5 years in the Gaza Strip-Palestine: a cross-sectional study
    El Kishawi, Rima Rafiq
    Soo, Kah Leng
    Abed, Yehia Awad
    Muda, Wan Abdul Manan Wan
    BMC PEDIATRICS, 2017, 17
  • [45] Study on main contents of highway construction project post-evaluation
    Wang, J.J.
    Xi'an Gonglu Jiaotong Daxue Xuebao/Journal of Xi'an Highway University, 2001, 21 (03):
  • [46] The Research on the Main Methods and Application of Post-evaluation of Land Consolidation Projects
    Zhu Huiqing
    Hao Jianxin
    URBANIZATION AND LAND RESERVATION RESEARCH, 2009, : 313 - +
  • [47] SIGNIFICANT FACTORS CAUSING TIME AND COST OVERRUNS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP: CONTRACTORS' PERSPECTIVE
    Enshassi, Adnan
    Kumaraswamy, Mohan
    Al-Najjar, Jomah
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (01) : 35 - 60
  • [48] The Relationship between Projects Management Managers' Competencies and Employees' Performance of Construction Industry at Gaza Strip
    El Sawalhi, Nabil
    Lafy, Ramy
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (02): : 38 - 52
  • [49] Quantifying the Generated and Percolated Leachate through a Landfill's Lining System in Gaza Strip, Palestine
    Abunama, Taher
    Othman, Faridah
    Alslaibi, Tamer
    Abualqumboz, Motasem
    POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2017, 26 (06): : 2455 - 2461
  • [50] Coping behaviors to deal with stress and stressor consequences among construction professionals A case study at the Gaza Strip, Palestine
    Enshassi, Adnan
    Al-Swaity, Eman
    Aziz, Abdul Rashid Abdul
    Choudhry, Rafiq
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2018, 23 (01) : 40 - 56