Post-evaluation System in Construction Projects in Gaza Strip-Palestine

被引:0
|
作者
Enshassi, Adnan Ali [1 ]
Arain, Faisal [2 ]
El-Rayyes, Yasmine [1 ]
机构
[1] IUG Civil Engn, Gaza Strip Palestine, Gaza City Gaza, Palestine
[2] Northern Alberta Inst Technol, Sch Sustainable Bldg & Environm Management, Edmonton, AB, Canada
关键词
Construction; Donors; Project success; Post-evaluation;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A construction project can be described as successful when it is completed on time, within budget and according to specifications. Post-evaluation plays a major role in the construction industry when determining whether the project is a success or a failure. The objectives of this paper are as follows: to provide an overview of an organisation's interest in the post-evaluation system of the construction projects in the Gaza Strip, to identify and rank the most important factors used in the post-evaluation system for construction projects, to identify the obstacles of the post-evaluation system and to determine the factors that lead to a successful post-evaluation system. A structured questionnaire was adopted in this study; 40 questionnaires were distributed to international organisations that implemented construction projects in the Gaza Strip. The ordinal data were analysed by the relative important index method, which was used to rank the factors and the groups of the questionnaire and the nominal data were analysed by the relative frequency or percentage. The research findings revealed that international organisations in the Gaza Strip are concerned with the post-evaluation system of construction projects because post-evaluation is required by all donors. Cost, time and quality are found to be the most important group factors for the post-evaluation system of construction projects. The factors that are used in the process of post-evaluation include the following: project efficiency, owner satisfaction, project effectiveness, safety, risks, change orders, resources, communication, procurement and the environment. Overloaded projects were found to be the largest obstacle to the process of post-evaluation. A lack of awareness about post-evaluation will increase the risk of not complying with donor requirements, which affects potential future funding. Evaluator efficiency was found to be the most important factor leading to a successful post-evaluation system. This paper recommends that organisations consider other factors, such as safety and environmental impact. It is advisable to consider risk factors in the evaluation process because the Gaza Strip suffers from political and economic instability and to increase the evaluators' awareness concerning environmental and safety impacts in the evaluation process. The findings from this study would also be valuable for all construction professionals involved in the construction industry in general.
引用
收藏
页码:51 / 73
页数:23
相关论文
共 50 条
  • [1] Assessment of solar energy potential in Gaza Strip-Palestine
    Nassar, Yasser Fathi
    Alsadi, Samer Yassin
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2019, 31 : 318 - 328
  • [2] Bridging the domestic water demand gap in Gaza Strip-Palestine
    Ai-Yaqubi, Ahmad
    Aliewi, Amjad
    Mimi, Ziad
    WATER INTERNATIONAL, 2007, 32 (02) : 219 - 229
  • [3] Demarketing strategies to rationalize electricity consumption in the Gaza Strip-Palestine
    Salem, Mohammed Z.
    Ertz, Myriam
    Sarigollu, Emine
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2021, 143
  • [4] Energy Management Application in Construction Projects in the Gaza Strip, Palestine
    Enshassi, Adnan
    Ayash, Abed
    Mohamed, Sherif
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2019, 24 (01) : 1 - 21
  • [5] An Evaluation of Patients’ Opinions of Primary Care Physicians: the Use of EUROPEP in Gaza Strip-Palestine
    Tayser Abu Mourad
    Suzanne Shashaa
    Adelais Markaki
    Athanasios Alegakis
    Christos Lionis
    Anastas Philalithis
    Journal of Medical Systems, 2007, 31 : 497 - 503
  • [6] An evaluation of patients' opinions of primary care physicians: The use of EUROPEP in gaza strip-palestine
    Abu Mourad, Tayser
    Shashaa, Suzanne
    Markaki, Adelais
    Alegakis, Athanasios
    Lionis, Christos
    Philalithis, Anastas
    JOURNAL OF MEDICAL SYSTEMS, 2007, 31 (06) : 497 - 503
  • [7] Factors influencing resource availability for post-disaster housing reconstruction: the case of Gaza Strip-Palestine
    Saleh, Nour
    Enshassi, Adnan
    Sundermeier, Matthias
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (12) : 1364 - 1374
  • [8] Normal blood cells reference intervals of healthy adults at the Gaza Strip-Palestine
    Sirdah, Mahmoud M.
    Tarazi, Issa S.
    Jeadi, Hesham El
    Haddad, Rami M. Al
    JOURNAL OF CLINICAL LABORATORY ANALYSIS, 2008, 22 (05) : 353 - 361
  • [9] Construction and evaluation of post-evaluation index system on loan projects of international financial organizations
    Xie, Wenxuan
    Tian, Guiliang
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 95 - 99
  • [10] Policymakers? and patients? perspectives on breast cancer management in the Gaza Strip-Palestine: A qualitative study
    Eid, Mo'min Khalil
    Abu-Odah, Hammoda
    Wehedi, Dalia Talaat
    Su, Jing Jing
    Abed, Yehia
    EUROPEAN JOURNAL OF ONCOLOGY NURSING, 2022, 61