Solving University Scheduling Problem Using Hybrid Approach

被引:0
|
作者
Shaikh, Aftab Ahmed [1 ]
Bukhari, Abdul Hussain Shah [2 ]
Memon, Zubair Ahmed [3 ]
机构
[1] Beihang Univ, Sch Comp Sci & Engn, Beijing, Peoples R China
[2] Blochistan Univ Informat Technlo Engn & Managemen, Fac Informat & Commun Technol, Quetta, Pakistan
[3] Mehran Univ Engn & Technol, Dept Elect Engn, Jamshoro, Pakistan
关键词
Course Timetabling Problem; GA; Backtracking Recursive Search;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In universities scheduling curriculum activity is an essential job. Primarily, scheduling is a distribution of limited resources under interrelated constraints. The set of hard constraints demand the highest priority and should not to be violated at any cost, while the maximum soft constraints satisfaction mounts the quality scale of solution. In this research paper, a novel bisected approach is introduced that is comprisesd of GA (Genetic Algorithm) as well as Backtracking Recursive Search. The employed technique deals with both hard and soft constraints successively. The first phase decisively is focused over elimination of all the hard constraints bounded violations and eventually produces partial solution for subsequent step. The second phase is supposed to draw the best possible solution on the search space. Promising results are obtained by implementation on the real dataset. The key points of the research approach are to get assurance of hard constraints removal from the dataset and minimizing computational time for GA by initializing pre-processed set of chromosomes.
引用
收藏
页码:613 / 624
页数:12
相关论文
共 50 条
  • [31] Solving an Integration Process Planning and Scheduling in a Flexible Job Shop Using a Hybrid Approach
    Keddari, Nassima
    Mebarki, Nasser
    Shahzad, Atif
    Sari, Zaki
    COMPUTATIONAL INTELLIGENCE AND ITS APPLICATIONS, 2018, 522 : 387 - 398
  • [32] A hybrid approach for solving multi-mode resource-constrained project scheduling problem in construction
    Roslon, Jerzy Hubert
    Kulejewski, Janusz Edward
    OPEN ENGINEERING, 2019, 9 (01): : 7 - 13
  • [33] Reactive scheduling approach for solving a realistic flexible job shop scheduling problem
    Mihoubi, B.
    Bouzouia, B.
    Gaham, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (19) : 5790 - 5808
  • [34] A hybrid genetic approach for solving an integrated multi-objective operating room planning and scheduling problem
    Guido, Rosita
    Conforti, Domenico
    COMPUTERS & OPERATIONS RESEARCH, 2017, 87 : 270 - 282
  • [35] A Hybrid Approach Based on Grey Wolf and Whale Optimization Algorithms for Solving Cloud Task Scheduling Problem
    Ababneh, Jafar
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [36] Heuristic approach for solving a pipe layer fleet scheduling problem
    Queiroz, M. M.
    Mendes, A. B.
    SUSTAINABLE MARITIME TRANSPORTATION AND EXPLOITATION OF SEA RESOURCES, VOL 2, 2012, : 1073 - 1080
  • [37] A parallel approach for solving multiple machine job scheduling problem
    Chen, M
    Zhang, CN
    Li, J
    COMPUTER APPLICATIONS IN INDUSTRY AND ENGINEERING, 2000, : 32 - 35
  • [38] A Genetic Algorithm approach for solving a Job Shop Scheduling problem
    Anshulika
    Bewoor, L. A.
    2017 INTERNATIONAL CONFERENCE ON COMPUTER COMMUNICATION AND INFORMATICS (ICCCI), 2017,
  • [39] A nested decomposition approach for solving the paratransit vehicle scheduling problem
    Karabuk, Suleyman
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2009, 43 (04) : 448 - 465
  • [40] A genetic approach for solving a scheduling problem in a robotized analytical system
    Rochat, Y
    JOURNAL OF HEURISTICS, 1998, 4 (03) : 245 - 261