A DOUBLE EXPONENTIALLY WEIGHTED MOVING AVERAGE CONTROL PROCEDURE WITH VARIABLE SAMPLING INTERVALS

被引:63
|
作者
SHAMMA, SE [1 ]
AMIN, RW [1 ]
SHAMMA, AK [1 ]
机构
[1] UNIV W FLORIDA,DEPT MATH SCI,PENSACOLA,FL 32514
关键词
AVERAGE RUN LENGTH; VARIABLE TIME DELAY; PROCESS CONTROL; DEWMA; SWITCHING;
D O I
10.1080/03610919108812969
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
Shewhart, cumulative sum (CUSUM), and exponentially weighted moving average (EWMA) control procedures with variable sampling intervals (VSI) have been investigated in recent years for detecting shifts in the process mean. Such procedures have been shown to be more efficient when compared with the corresponding fixed sampling interval (FSI) charts with respect to the average time to signal (ATS) when the average run length (ARL) values of both types of procedures are held equal. Frequent switching between the different sampling intervals can be a complicating factor in the application of control charts with variable sampling intervals. In this article, we propose using a double exponentially weighted moving average control procedure with variable sampling intervals (VSI-DEWMA) for detecting shifts in the process mean. It is shown that the proposed VSI-DEWMA control procedure is more efficient when compared with the corresponding fixed sampling interval FSI-DEWMA chart with respect to the average time to signal (ATS) when the average run length (ARL) values of both types of procedures are held equal. It is also shown that the VSI-DEWMA procedure reduces the average number of switches between the sampling intervals and has similar ATS properties as compared to the VSI-EWMA control procedure.
引用
收藏
页码:511 / 528
页数:18
相关论文
共 50 条
  • [41] Determination of a new sampling system based on exponentially weighted moving average
    Balamurali, S.
    SEQUENTIAL ANALYSIS-DESIGN METHODS AND APPLICATIONS, 2018, 37 (02): : 158 - 173
  • [42] Mixed sampling plan based on exponentially weighted moving average statistic
    Aslam, Muhammad
    Azam, Muhammad
    Jun, Chi-Hyuck
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2016, 45 (22) : 6709 - 6719
  • [43] A new lot inspection procedure based on exponentially weighted moving average
    Aslam, Muhammad
    Azam, Muhammad
    Jun, Chi-Hyuck
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2015, 46 (08) : 1392 - 1400
  • [44] Grouped data exponentially weighted moving average control charts
    Steiner, SH
    JOURNAL OF THE ROYAL STATISTICAL SOCIETY SERIES C-APPLIED STATISTICS, 1998, 47 : 203 - 216
  • [45] An Optimization Design of the Exponentially Weighted Moving Average Control Chart
    Aghniaei, Mona
    Shamsuzzaman, Mohammad
    Hamdan, Sadeque
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1719 - 1722
  • [46] Exponentially Weighted Moving Average Hypergeometric np Control Scheme
    Chong, Zhi Lin
    Castagliola, Philippe
    Johannssen, Arne
    Khoo, Michael B. C.
    Chukhrova, Nataliya
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2025,
  • [47] Fuzzy multivariate exponentially weighted moving average control chart
    Hossein Alipour
    Rassoul Noorossana
    The International Journal of Advanced Manufacturing Technology, 2010, 48 : 1001 - 1007
  • [48] Improving the Performance of Exponentially Weighted Moving Average Control Charts
    Abujiya, Mu'azu Ramat
    Lee, Muhammad Hisyam
    Riaz, Muhammad
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2014, 30 (04) : 571 - 590
  • [49] A Multivariate Adaptive Exponentially Weighted Moving Average Control Chart
    Mahmoud, Mahmoud A.
    Zahran, Alyaa R.
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2010, 39 (04) : 606 - 625
  • [50] Fuzzy multivariate exponentially weighted moving average control chart
    Alipour, Hossein
    Noorossana, Rassoul
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (9-12): : 1001 - 1007