共 50 条
- [43] EQUIPMENT FOR CO2 ARC-WELDING WITH ADDITIONAL FILLER WIRE WELDING PRODUCTION, 1974, 21 (09): : 88 - 89
- [44] CONTROLLING ARC-WELDING PROCESS BY PROGRAMMING ELECTRODE WIRE FEED RATE AUTOMATIC WELDING USSR, 1977, 30 (01): : 1 - 4
- [45] EFFECTS OF STATE OF SURFACE OF ELECTRODE WIRE ON METAL TRANSFER DURING GAS-SHIELDED ARC-WELDING AUTOMATIC WELDING USSR, 1977, 30 (03): : 47 - 48
- [47] COPPERED WIRE USED FOR SUBMERGED ARC-WELDING IN CONSTRUCTION OF PIPE LINES AUTOMATIC WELDING USSR, 1971, 24 (11): : 41 - +
- [48] REMOVAL OF WELDING SMOKE AT ARC USING GAS-METAL ARC AND FLUX CORED ARC-WELDING PROCESSES AMERICAN INDUSTRIAL HYGIENE ASSOCIATION JOURNAL, 1972, 33 (02): : 16 - &
- [49] CONTACT TUBE WEAR DETECTION IN GAS METAL ARC-WELDING WELDING JOURNAL, 1995, 74 (04) : S115 - S121
- [50] AUTOMATIC GAS-SHIELDED ARC-WELDING OF PLATE METAL AUTOMATIC WELDING USSR, 1973, 26 (02): : 44 - 46