共 50 条
- [31] RATIONAL USE OF DRILLING SOLUTION DURING WELL-DRILLING IN WESTERN SIBERIA NEFTYANOE KHOZYAISTVO, 1983, (12): : 7 - 9
- [32] WELL-DRILLING AT YAREGSKOE OILFIELD DEVELOPED BY THERMOMINE METHOD NEFTYANOE KHOZYAISTVO, 1979, (09): : 64 - 67
- [33] PROPERTY CONTROL OF CALCIUM BROMIDE SOLUTIONS FOR WELL-DRILLING NEFTYANOE KHOZYAISTVO, 1982, (03): : 18 - 20
- [34] NEUTRALIZATION OF HYDROGEN-SULFIDE DURING WELL-DRILLING NEFTYANOE KHOZYAISTVO, 1977, (12): : 51 - 52
- [36] EFFICIENCY OF WELL-DRILLING BY A7SH3 TURBINE DRILLS WITH A DAMPING SYSTEM OF VIBRATIONS NEFTYANOE KHOZYAISTVO, 1979, (04): : 16 - 18
- [37] BASIC TECHNICAL SOLUTIONS OFFERING DEEPER WELL-DRILLING NEFTYANOE KHOZYAISTVO, 1994, (06): : 13 - 16
- [38] THE ADVANTAGES OF AUTOMATICALLY CONTROLLED PROJECTING OF WELL-DRILLING CONSTRUCTION NEFTYANOE KHOZYAISTVO, 1984, (09): : 13 - 14
- [39] LABORATORY OF TECHNICAL EQUIPMENT FOR LIQUIDATION OF ACCIDENTS IN WELL-DRILLING NEFTYANOE KHOZYAISTVO, 1993, (01): : 40 - 43
- [40] IMPROVEMENT OF TESTING TECHNOLOGY OF BEDS IN WELL-DRILLING PROCESSES NEFTYANOE KHOZYAISTVO, 1978, (05): : 19 - 23