共 50 条
- [41] On a parallel machine scheduling problem with precedence constraints Journal of Scheduling, 2006, 9 : 493 - 495
- [47] A flowshop scheduling problem with machine deterioration and maintenance activities 2012 17TH INTERNATIONAL CONFERENCE ON METHODS AND MODELS IN AUTOMATION AND ROBOTICS (MMAR), 2012, : 40 - 45