Performance of adaptive np-chart with estimated parameter

被引:9
|
作者
Hashemian, S. Mohammad [1 ]
Noorossana, Rassoul [1 ]
Keyvandarian, Ali [1 ]
Shekary, Maryam A. [2 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[2] Tarbiat Modares Univ, Dept Ind Engn, Tehran, Iran
关键词
Parameter estimation; Adaptive control charts; Average number of observations to signal; Average time-to-signal (ATS); Defective proportion;
D O I
10.1108/IJQRM-05-2014-0059
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this paper is to compare the performances of np-VP control chart with estimated parameter to the np-VP control chart with known parameter using average time-to-signal (ATS), standard deviation of the time-to-signal (SDTS), and average number of observations to signal (ANOS) as performance measures. Design/methodology/approach - The approach used in this study is probabilistic in which the expected values of performance measures are calculated using probabilities of different estimators used to estimate process parameter. Findings - Numerical results indicate different performances for the np-VP control chart in known and estimated parameter cases. It is obvious that when process parameter is not known and is estimated using Phase I data, the chart does not perform as user expects. To tackle this issue, optimal Phase I estimation scenarios are recommended to obtain the best performance from the chart in the parameter estimation case in terms of performance measures. Practical implications - This research adds to the body of knowledge in quality control of process monitoring systems. This paper may be of particular interest to practitioners of quality systems in factories where products are monitored to reduce the number of defectives and np chart parameter needs to be estimated. Originality/value - The originality of this paper lies within the context in which an adaptive np control chart is studied and the process parameter unlike previous studies is assumed unknown. Although other types of control charts have been studied when process parameter is unknown but this is the first time that adaptive np chart performance with estimated process parameter is studied.
引用
收藏
页码:769 / 791
页数:23
相关论文
共 50 条
  • [32] A novel partially parameter-free adaptive multivariate EWMA mean chart
    Haq, Abdul
    Khoo, Michael B. C.
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2022, 38 (01) : 574 - 591
  • [33] The EWMA median chart with estimated parameters
    Castagliola, Philippe
    Maravelakis, Petros E.
    Figueiredo, Fernanda Otilia
    IIE TRANSACTIONS, 2016, 48 (01) : 66 - 74
  • [34] On the performance of the adaptive EWMA chart for monitoring time between events
    Hu, XueLong
    Castagliola, Philippe
    Zhong, JianLan
    Tang, AnAn
    Qiao, YuLong
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2021, 91 (06) : 1175 - 1211
  • [35] The performance of the adaptive EWMA median chart in the presence of measurement error
    Tang, Anan
    Castagliola, Philippe
    Hu, Xuelong
    Sun, Jinsheng
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2019, 35 (01) : 423 - 438
  • [36] Guaranteed in-control control chart performance with cautious parameter learning
    Capizzi, Giovanna
    Masarotto, Guido
    JOURNAL OF QUALITY TECHNOLOGY, 2020, 52 (04) : 385 - 403
  • [37] Conditional and marginal performance of the Poisson CUSUM control chart with parameter estimation
    Testik, Murat Caner
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (23) : 5621 - 5638
  • [38] An Analytic Variable Limit np Control Chart
    Abooie, M. H.
    Aminnayeri, M.
    SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2010, 17 (01): : 48 - 57
  • [39] Can a variable be monitored by an np chart effectively?
    Wu, Z.
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1384 - 1388
  • [40] A multiattribute cumulative sum-np chart
    Chong, Nger Ling
    Khoo, Michael B. C.
    Haridy, Salah
    Shamsuzzaman, Mohammad
    STAT, 2019, 8 (01):