共 50 条
- [34] SURFACE AND UNDERGROUND AUTOMATED MINE SURVEYS. Mining Engineer London, 1984, 143 (271): : 465 - 470
- [35] IMPLEMENTATION OF FOREMAN-DELAY SURVEYS. Journal of the Construction Division, 1982, 108 (CO4): : 577 - 591
- [39] OPTIMIZATION OF THE BREAKTHROUGH ACCURACY IN TUNNELING SURVEYS. Canadian surveyor, 1981, 35 (01): : 5 - 16
- [40] On the probable error of sampling in soil surveys. JOURNAL OF AGRICULTURAL SCIENCE, 1915, 7 : 144 - 153