Genetic Algorithms for Optimization of Resource Allocation in Large Scale Construction Project Management

被引:16
|
作者
Huang, Jian-Wen [1 ]
Wang, Xing-xia [2 ]
Chen, Rui [3 ]
机构
[1] China Three Gorges Univ, Coll Hydraul Environm Engn, Hydraul Struct Engn, Yichang, Peoples R China
[2] China Three Gorges Univ, Coll Hydraul Environm Engn, Yichang, Peoples R China
[3] China Three Gorges Univ, Coll Hydraul Environm Engn, Management Sci & Engn, Yichang, Peoples R China
关键词
resource allocation; resource leveling; Genetic Algorithms; optimization; large-scale construction project;
D O I
10.4304/jcp.5.12.1916-1924
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
It is well known that a construction project is the process of resource consumption. Especially for large project, more kinds of resources are involved and the amount is very huge. In construction process of a project, the resource is limited and the time is very urgent, so for large scale project management there are some important subjects such as how to effectively distribute resources between each activities and how to effectively utilize limited resources. Therefore, it's of great importance to optimize the allocation of construction resource. This paper analyzes existing problems of resource allocation for large scale project, such as shortest construction duration with limited resource and resource leveling with stationary construction duration. Based on that, the corresponding mathematical optimization model is established and solution method on the basis of genetic algorithm is given. Comparing with traditional methods, better results are given when genetic algorithm is used, which can not only compress project duration in maximum, but also reasonably arrange activity starting time in uncritical path, and adjust the order of resource in different activities, to lower the peak of dynamic resource distribution curve as much as possible and to make resource consumption be in equilibrium state. Application in an engineering case shows that genetic algorithm can solve relative problems of resource allocation optimization in network planning for large-scale project very well and will be widely used in project optimization.
引用
收藏
页码:1916 / 1924
页数:9
相关论文
共 50 条
  • [41] A robust genetic algorithm for resource allocation in project scheduling
    Alcaraz, J
    Maroto, C
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 83 - 109
  • [42] A Robust Genetic Algorithm for Resource Allocation in Project Scheduling
    J. Alcaraz
    C. Maroto
    Annals of Operations Research, 2001, 102 : 83 - 109
  • [43] Cooperative Particle Swarm Optimization With a Bilevel Resource Allocation Mechanism for Large-Scale Dynamic Optimization
    Liu, Xiao-Fang
    Zhang, Jun
    Wang, Jun
    IEEE TRANSACTIONS ON CYBERNETICS, 2023, 53 (02) : 1000 - 1011
  • [44] A construction schedule management method of large-scale construction project based on BIM model
    Yin, Sheng
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2023, 19 (02) : 140 - 153
  • [45] GENETIC ALGORITHMS - A POWERFUL TOOL FOR LARGE-SCALE NONLINEAR OPTIMIZATION PROBLEMS
    GALLAGHER, K
    SAMBRIDGE, M
    COMPUTERS & GEOSCIENCES, 1994, 20 (7-8) : 1229 - 1236
  • [46] Large-scale air combat tactics optimization using genetic algorithms
    Mulgund, S
    Harper, K
    Krishnakumar, K
    Zacharias, G
    JOURNAL OF GUIDANCE CONTROL AND DYNAMICS, 2001, 24 (01) : 140 - 142
  • [47] Multilevel optimization control for large-scale systems using genetic algorithms
    EL mdbouly, EE
    Ibrahim, AAS
    El-Far, GZ
    El Nassef, M
    ICEEC'04: 2004 INTERNATIONAL CONFERENCE ON ELECTRICAL, ELECTRONIC AND COMPUTER ENGINEERING, PROCEEDINGS, 2004, : 193 - 197
  • [48] EVOLUTIONARY OPTIMIZATION OF RESOURCE ALLOCATION IN REPETITIVE CONSTRUCTION SCHEDULES
    Nassar, Khaled
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2005, 10 : 265 - 273
  • [49] A model to optimize project resource allocation by construction of a balanced histogram
    Konstantinidis, PD
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 104 (03) : 559 - 571
  • [50] Genetic Algorithms for the Resource Constrained Project Scheduling Problem
    Gargiulo, F.
    Quagliarella, D.
    13TH IEEE INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND INFORMATICS (CINTI 2012), 2012, : 39 - 47