PROGRESS IN INTEGRATING AND OPTIMIZING PRODUCTION PLANS AND SCHEDULES

被引:4
|
作者
SEWARD, SM
TAYLOR, SG
BOLANDER, SF
机构
关键词
D O I
10.1080/00207548508904732
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:609 / 624
页数:16
相关论文
共 50 条
  • [21] Optimizing radiata pine drying schedules
    Riley, S.
    Sargent, R.
    WOOD MATERIAL SCIENCE & ENGINEERING, 2011, 6 (1-2) : 7 - 14
  • [22] OPTIMIZING IMMUNIZATION SCHEDULES FOR THERAPEUTIC VACCINATION
    Dang, Yushe
    Cecil, Denise
    Corulli, Lauren
    Rodmaker, Erin
    Disis, Mary
    JOURNAL FOR IMMUNOTHERAPY OF CANCER, 2022, 10 : A1219 - A1219
  • [23] OPTIMIZING SCREW-REPAIR SCHEDULES
    MUZZY, JD
    MODERN PLASTICS, 1976, 53 (10): : 54 - 56
  • [24] RECOMMENDATIONS FOR STUDIES OPTIMIZING TREATMENT SCHEDULES
    CREUTZIG, U
    WINKLER, K
    KLINISCHE PADIATRIE, 1994, 206 (04): : 191 - 193
  • [25] Towards self-recovering construction schedules: a new method for periodically updating project plans and optimizing recovery actions
    AlJassmi, Hamad
    Abduljalil, Yusef
    Philip, Babitha
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2023, 22 (04) : 2335 - 2347
  • [26] Estimating the probability of meeting a deadline in schedules and plans
    Cohen, Liat
    Shimony, Solomon Eyal
    Weiss, Gera
    ARTIFICIAL INTELLIGENCE, 2019, 275 : 329 - 355
  • [27] ICI PLANS AND PROGRESS
    MOXEY, P
    MANUFACTURING CHEMIST AND AEROSOL NEWS, 1967, 38 (12) : 48 - &
  • [28] ISA - PLANS FOR PROGRESS
    不详
    INSTRUMENTATION TECHNOLOGY, 1970, 17 (01): : 64 - &
  • [29] Elise plans and progress
    Kwan, JW
    Bangerter, RO
    Faltens, A
    Lee, EP
    Peters, C
    Reginato, LL
    Barnard, JJ
    Sharp, WM
    FUSION ENGINEERING AND DESIGN, 1996, 32-33 : 299 - 308