FEASIBILITY STUDY SUPPORTS DEVELOPMENT OF OLYMPIC DAM

被引:0
|
作者
TODD, JC
机构
来源
E&MJ-ENGINEERING AND MINING JOURNAL | 1985年 / 186卷 / 08期
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
引用
收藏
页码:16 / &
相关论文
共 50 条
  • [41] Introduction of autonomous loaders to Olympic Dam Operations, Australia
    McHugh, C.
    9th AusIMM Underground Operators Conference 2005, 2005, 2005 (01): : 127 - 131
  • [42] Apatite at Olympic Dam, South Australia: A petrogenetic tool
    Krneta, Sasha
    Ciobanu, Cristiana L.
    Cook, Nigel J.
    Ehrig, Kathy
    Kontonikas-Charos, Alkis
    LITHOS, 2016, 262 : 470 - 485
  • [43] Developments in direct-to-blister smelting at Olympic Dam
    Hunt, AG
    Day, SK
    Shaw, RG
    West, RC
    SMELTING OPERATIONS AND ADVANCES, 1999, : 239 - 253
  • [44] Prehistoric mining at Olympic Dam in arid South Australia
    Sullivan, Marjorie
    Hughes, Philip
    Way, Amy Mosig
    Spooner, Nigel
    ARCHAEOLOGY IN OCEANIA, 2014, 49 (01) : 43 - 55
  • [45] Mound Springs of the Great Artesian Basin in South Australia: a case study from Olympic Dam
    Mudd, GM
    ENVIRONMENTAL GEOLOGY, 2000, 39 (05): : 463 - 476
  • [46] Feasibility Study on Non-dam Floating Adjustable Intake for Hydropower
    Zhang, Xin
    Yuan, Linjuan
    Jiang, Min
    Zheng, Mingke
    Ji, Changzhi
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [47] FEASIBILITY STUDY ON TRINCOMALEE DEVELOPMENT
    不详
    DOCK & HARBOUR AUTHORITY, 1969, 49 (581): : 417 - &
  • [48] Feasibility of wolf reintroduction to Olympic Peninsula, Washington
    Ratti, JT
    Weinstein, M
    Scott, JM
    Wiseman, PA
    Gillesberg, AM
    Miller, CA
    Szepanski, MM
    Svancara, LK
    NORTHWEST SCIENCE, 2004, 78 : 1 - 76
  • [49] Increasing throughput at Olympic Dam by effective management of the mine bottleneck
    Bloss, M.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2009, 118 (01): : 33 - 46
  • [50] WMC's Olympic Dam faces major furnace repairs
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2002, 203 (08): : 7 - 7