PERCEIVED DEGREE OF DIFFICULTY OF MANAGEMENT TASKS IN CONSTRUCTION REFURBISHMENT WORK

被引:4
|
作者
EGBU, CO
机构
来源
BUILDING RESEARCH AND INFORMATION | 1995年 / 23卷 / 06期
关键词
CONSTRUCTION REFURBISHMENT DIFFICULTIES; MANAGEMENT TASKS;
D O I
10.1080/09613219508727486
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
It is suggested that further research should aim to produce guidelines for best practice which would help in better monitoring of costs for the works and also improve project completion times.
引用
收藏
页码:340 / 344
页数:5
相关论文
共 50 条
  • [21] ACQUISITION OF COMPETENCES IN A MASTER DEGREE IN CONSTRUCTION MANAGEMENT
    Yepes, Victor
    Segado, Saray
    Pellicer, Eugenio
    Torres-Machi, Cristina
    INTED2016: 10TH INTERNATIONAL TECHNOLOGY, EDUCATION AND DEVELOPMENT CONFERENCE, 2016, : 718 - 727
  • [22] The Impact of Work Stressors on Identity Threats and Perceived Stress: An Exploration of Sources of Difficulty at Work Among French Psychologists
    Berjot, Sophie
    Altintas, Emin
    Lesage, Francois-Xavier
    Grebot, Elisabeth
    SAGE OPEN, 2013, 3 (03):
  • [23] Manpower simulation model for optimizing construction management tasks
    Tokura, Kentaro
    Haruyama, Shinichiro
    JAPAN ARCHITECTURAL REVIEW, 2023, 6 (01)
  • [24] DYADIC PERFORMANCE ON 2 TASKS AS A FUNCTION OF TASK-DIFFICULTY, WORK STRATEGY, AND MEMBER ABILITY
    SHIFLETT, S
    JOURNAL OF APPLIED PSYCHOLOGY, 1976, 61 (04) : 455 - 462
  • [25] The Construction of Harmonious Degree Perspective of Project Construction Contract Management Research
    Zhang, Cai-Hong
    2016 INTERNATIONAL CONFERENCE ON SERVICE SCIENCE, TECHNOLOGY AND ENGINEERING (SSTE 2016), 2016, : 324 - 329
  • [26] Construction Management: Subcontractor Scopes of Work
    Schaffhauser-Linzatti, Michaela
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2012, 30 (09) : 812 - +
  • [27] Effect of exoskeletons used in industry on perceived exertion during standardized work tasks
    Schalk M.
    Schalk I.
    Holl M.
    Kopp V.
    Bauernhansl T.
    Siegert J.
    Schneider U.
    WT Werkstattstechnik, 2022, 112 (09): : 607 - 612
  • [28] BBB-Memorandum 2015: tasks and objectives for construction engineering, construction economics and construction management
    Tautschnig, A.
    Osebold, R.
    Bargstaedt, H. -J.
    BAUINGENIEUR, 2015, 90 : 415 - 419
  • [29] Construction Pruning for Optimal Control of Process with Deadtime under Extreme High Degree of Control Difficulty
    Xue Yali
    Xiang Guobo
    Hang Yuqiong
    PROCEEDINGS OF THE 30TH CHINESE CONTROL AND DECISION CONFERENCE (2018 CCDC), 2018, : 4757 - 4763
  • [30] Difficulty in 'Return-to-Work' After Whiplash Injury: The Role of Pain Self- Efficacy in Mediating the Effects of Neck Disability on Perceived Difficulty in the Return to Work Process
    Guy, Lynette
    Kendall, Elizabeth
    Charker, Jill
    Bellamy, Nick
    AUSTRALIAN JOURNAL OF REHABILITATION COUNSELLING, 2005, 11 (01): : 22 - 33