共 50 条
- [21] ACQUISITION OF COMPETENCES IN A MASTER DEGREE IN CONSTRUCTION MANAGEMENT INTED2016: 10TH INTERNATIONAL TECHNOLOGY, EDUCATION AND DEVELOPMENT CONFERENCE, 2016, : 718 - 727
- [25] The Construction of Harmonious Degree Perspective of Project Construction Contract Management Research 2016 INTERNATIONAL CONFERENCE ON SERVICE SCIENCE, TECHNOLOGY AND ENGINEERING (SSTE 2016), 2016, : 324 - 329
- [27] Effect of exoskeletons used in industry on perceived exertion during standardized work tasks WT Werkstattstechnik, 2022, 112 (09): : 607 - 612
- [28] BBB-Memorandum 2015: tasks and objectives for construction engineering, construction economics and construction management BAUINGENIEUR, 2015, 90 : 415 - 419
- [29] Construction Pruning for Optimal Control of Process with Deadtime under Extreme High Degree of Control Difficulty PROCEEDINGS OF THE 30TH CHINESE CONTROL AND DECISION CONFERENCE (2018 CCDC), 2018, : 4757 - 4763
- [30] Difficulty in 'Return-to-Work' After Whiplash Injury: The Role of Pain Self- Efficacy in Mediating the Effects of Neck Disability on Perceived Difficulty in the Return to Work Process AUSTRALIAN JOURNAL OF REHABILITATION COUNSELLING, 2005, 11 (01): : 22 - 33