PLANT TRIMS POWER COSTS BY 18000-DOLLARS PER MONTH

被引:0
|
作者
不详
机构
来源
PUBLIC WORKS | 1984年 / 115卷 / 11期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:66 / 66
页数:1
相关论文
共 50 条
  • [42] INNOVATIONS CUT COSTS OF A POWER PLANT'S WATER SYSTEM.
    Narang, R.Paul
    Funston, Joseph
    Civil engineering New York, N.Y., 1982, 53 (07): : 46 - 49
  • [43] PREDICTING COSTS AND CONTROLLING PROGRESS IN NUCLEAR-POWER PLANT CONSTRUCTION
    ZINK, DA
    SCHAPPA, PJ
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 21 (JUN): : 401 - 402
  • [44] Seawater desalination costs cut through power plant co-location
    Voutchkov, N
    FILTRATION + SEPARATION, 2004, 41 (07) : 24 - 26
  • [45] A geographically resolved method to estimate levelized power plant costs with environmental externalities
    Rhodes, Joshua D.
    King, Carey
    Gulen, Guercan
    Olmstead, Sheila M.
    Dyer, James S.
    Hebner, Robert E.
    Beach, Fred C.
    Edgar, Thomas F.
    Webber, Michael E.
    ENERGY POLICY, 2017, 102 : 491 - 499
  • [46] Cover story: desalination costs reduces by power plant co-location
    Johnstone, H
    FILTRATION + SEPARATION, 2004, 41 (07) : 3 - 3
  • [47] POWER-PLANT SCHEDULING CONSTRUCTION, AND COSTS - 10-YEAR ANALYSIS
    BUDWANI, RN
    POWER ENGINEERING, 1982, 86 (08) : 36 - 49
  • [48] An analysis of the historical trends in nuclear power plant construction costs: The Japanese experience
    Matsuo, Yuhji
    Nei, Hisanori
    ENERGY POLICY, 2019, 124 : 180 - 198
  • [49] Optimizing electricity costs of wastewater treatment plant in presence of RES and power market
    Robescu, Lacramioara Diana
    Lazaroiu, George Cristian
    Dumbrava, Virgil
    Manea, Elena
    Presura, Aurel
    2015 9TH INTERNATIONAL SYMPOSIUM ON ADVANCED TOPICS IN ELECTRICAL ENGINEERING (ATEE), 2015, : 808 - 811
  • [50] Measuring the environmental costs of tidal power plant construction: A choice experiment study
    Lee, Joo-Suk
    Yoo, Seung-Hoon
    ENERGY POLICY, 2009, 37 (12) : 5069 - 5074