A MACHINE-SCHEDULING MODEL FOR LARGE-SCALE RICE PRODUCTION IN MALAYSIA

被引:1
|
作者
BINDERIS, S
OHTA, H
机构
[1] Department of Industrial Engineering, University of Osaka Prefecture
关键词
Dynamic programming; Linear programming; Machine allocation; Scheduling;
D O I
10.1057/jors.1990.100
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The problem of minimizing machine operation cost in a large-scale irrigated double-cropping rice production area in Malaysia was investigated. The combined effects of production environment, climatic conditions and agronomic requirements of the crop require the farmers to rent the machines from cooperatives or from the private sector. However, the high cost of operation and the unique machine demand structure lead to extreme machine shortages. Therefore, a production system which minimizes machine demand is required. In this study, a two-stage cost-minimizing procedure using dynamic programming and linear programming models was studied, and an example is presented. © 1989 Operational Research Society Ltd.
引用
收藏
页码:713 / 723
页数:11
相关论文
共 50 条
  • [31] A novel model of large-scale hydrothermal power system optimal scheduling
    Wang, Z
    He, GY
    Chen, XQ
    Zhou, SX
    2004 IEEE PES POWER SYSTEMS CONFERENCE & EXPOSITION, VOLS 1 - 3, 2004, : 518 - 523
  • [32] An Equivalent Aggregated Model of Large-Scale Flexible Loads for Load Scheduling
    Tu, Jing
    Zhou, Ming
    Cui, Hantao
    Li, Fangxing
    IEEE ACCESS, 2019, 7 : 143431 - 143444
  • [33] Towards Solving Large-Scale Precedence Constrained Production Scheduling Problems in Mining
    Kenny, Angus
    Li, Xiaodong
    Ernst, Andreas T.
    Thiruvady, Dhananjay
    PROCEEDINGS OF THE 2017 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE (GECCO'17), 2017, : 1137 - 1144
  • [34] Genetic algorithm for a large-scale scheduling problem in an electric wire production process
    Iima, H
    Sannomiya, N
    GECCO-99: PROCEEDINGS OF THE GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 1999, : 1784 - 1784
  • [35] An outlook on large-scale solar power production in Peninsular Malaysia for scenario year 2030
    Cheong, Kuen Hou
    Tai, Vin Cent
    Tan, Yong Chai
    Abd Rahman, Nor Faiza
    Chiong, Kai Shing
    Saw, Lip Huat
    INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND GREEN TECHNOLOGY 2019, 2020, 463
  • [36] Near-optimal solutions of large-scale single-machine scheduling problems
    Avella, P
    Boccia, M
    D'Auria, B
    INFORMS JOURNAL ON COMPUTING, 2005, 17 (02) : 183 - 191
  • [37] Solution method for a large-scale loom scheduling problem with machine eligibility and splitting property
    Eroglu, D. Yilmaz
    Ozmutlu, H. C.
    JOURNAL OF THE TEXTILE INSTITUTE, 2017, 108 (12) : 2154 - 2165
  • [38] Operation Decomposition and Statistical Bottleneck Machine Identification for Large-scale Job Shop Scheduling
    Zhang, Rui
    Wu, Cheng
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 153 - 158
  • [39] LARGE-SCALE PRODUCTION OF VIRUS
    NICKLIN, PM
    HOUSE, W
    BIOTECHNOLOGY AND BIOENGINEERING, 1976, 18 (05) : 723 - 727
  • [40] Large-scale hydrogen production
    Rostrup-Nielsen, JR
    Rostrup-Nielsen, T
    CATTECH, 2002, 6 (04) : 150 - 159