PARALLEL-PROCESSING OF BOILING WATER-REACTOR CORE ANALYSIS

被引:2
|
作者
UEMATSU, M
TSUIKI, M
KUBOTA, K
机构
[1] TOSHIBA CO LTD, NUCL ENGN LAB, KAWASAKI KU, KAWASAKI, KANAGAWA 210, JAPAN
[2] TOSHIBA CO LTD, CTR RES & DEV, SAIWAI KU, KAWASAKI, KANAGAWA 211, JAPAN
关键词
PARALLEL PROCESSING; BWR TYPE REACTORS; CORE ANALYSIS; SUPERCOMPUTERS; PROCESSING ELEMENTS; HYPERCUBE TYPE; MIMD; 3-DIMENSIONAL SEGMENTATION; CHECKER BOARD ITERATION SCHEME; COMMUNICATIONS; COMPUTATION TIME; COMPUTER CALCULATIONS; 1.5 GROUP NODAL NEUTRON DIFFUSION EQUATION; THERMAL HYDRAULIC CALCULATION;
D O I
10.3327/jnst.32.495
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
A parallel processing method for the analysis of a Boiling Water Reactor (BWR) core has been developed to drastically reduce the computation time. In the proposed method, a BWR core is divided into smaller segments, each of which is assigned to one bf the processing elements (PE) working in parallel. The whole computing task is divided into smaller tasks that are distributed to the PEs as equally as possible. To solve the neutron diffusion equations in BWR neutronics calculations, the three-dimensional checker-board block iterative method was adopted. In the thermal-hydraulic calculation, the whole task can be divided into parallel tasks except for the coolant enthalpy distribution calculation along a Row channel. Parallelization efficiency of the proposed method was examined by measuring computing time on a hypercube type parallel processor with 64 PEs. The computation speed gradually degrades with the number of segmentation, because of delay due to communications between PEs and to waiting time caused by unequal amount of tasks among PEs. A 64 PE calculation was found to be from 30 to 50 times faster than the 1 PE calculation. Both the axial and the radial segmentations were found to be effective in reducing computing time. If the BWR core analysis is made with a massively parallel processor consisting of more than 4,500 PEs, computing time will be reduced nearly by an order of three.
引用
收藏
页码:495 / 506
页数:12
相关论文
共 50 条
  • [31] EXPERIMENTAL-DETERMINATION OF NUCLEAR AND THERMOHYDRAULIC PARAMETERS IN THE CORE OF A BOILING WATER-REACTOR
    GEBURECK, P
    ATOMKERNENERGIE-KERNTECHNIK, 1982, 41 (03): : 182 - 185
  • [32] APPLICABILITY OF A MULTIVARIABLE AUTOREGRESSIVE METHOD TO BOILING WATER-REACTOR CORE STABILITY ESTIMATION
    SUZUKI, S
    FUKUNISHI, K
    KISHI, S
    YOSHIMOTO, Y
    KISHIMOTO, K
    NUCLEAR TECHNOLOGY, 1986, 74 (02) : 132 - 138
  • [33] RADIOLYTIC ENVIRONMENTS IN BOILING WATER-REACTOR CORES
    IBE, E
    NAGASE, M
    SAKAGAMI, M
    UCHIDA, S
    JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 1987, 24 (03) : 220 - 226
  • [34] BYPASS FLOW DISTRIBUTION IN A BOILING WATER-REACTOR
    CARLSON, RW
    GOTT, DR
    NUCLEAR TECHNOLOGY, 1977, 33 (02) : 161 - 173
  • [35] BOILING WATER-REACTOR LICENSING BASIS TRANSIENT
    LU, MS
    CHENG, HS
    SHIER, WG
    DIAMOND, DJ
    LEVINE, MM
    ODAR, F
    FIENO, D
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1979, 33 (NOV): : 473 - 474
  • [36] BOILING WATER-REACTOR CYCLE EXTENSION OPERATION
    FULLMER, GC
    NUCLEAR TECHNOLOGY, 1982, 57 (01) : 58 - 64
  • [37] COBALT TRANSPORT MECHANISM IN A BOILING WATER-REACTOR
    HEMMI, Y
    KAMATA, T
    NAKAYAMA, Y
    NAGAO, H
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 43 : 340 - 340
  • [38] ADVANCED BOILING WATER-REACTOR MATERIALS TECHNOLOGY
    SANDUSKY, DW
    OKADA, T
    SAITO, T
    MATERIALS PERFORMANCE, 1990, 29 (01) : 66 - 71
  • [39] SPECTRAL SHIFT ROD FOR THE BOILING WATER-REACTOR
    YOKOMIZO, O
    KASHIWAI, S
    NISHIDA, K
    ORII, A
    YAMASHITA, J
    MOCHIDA, T
    NUCLEAR ENGINEERING AND DESIGN, 1993, 144 (02) : 223 - 236
  • [40] AN OVERVIEW OF BOILING WATER-REACTOR PIPE CRACKING
    DANKO, JC
    STAHLKOPF, KE
    ROSSIN, AD
    INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 1981, 9 (06) : 401 - 419