Heuristics for Determining Module Stocks in Assemble-to-order Systems

被引:0
|
作者
da Cunha, Catherine [1 ]
Frein, Yannick [2 ]
机构
[1] IRCCyN, 1 Rue Noe,BP 92101, F-44321 Nantes 03, France
[2] INP Grenoble UJF CNRS, Lab G SCOP, F-38031 Grenoble 1, France
关键词
Production; Information; Heuristics; Assemble-to-Order;
D O I
10.3166/JDS.17.403-424
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In an assemble-to-order context, the choice of a modular design is of paramount importance. The selection of the semi-finished products that would be kept in stock, indeed impacts the whole supply chain (storage, transport, production, etc.). In this article, this lever is used to minimize, for a given number of stocked modules, the mean final assembly time. The choice of a stock composition has to be done according to the information about the demand; the major issue is to address this problem when the demand is not totally known. Here, an original modelling that enables to integrate this aspect is proposed. This combinatorial optimization problem is addressed using heuristics. The performances of the proposed heuristics are evaluated trough computational tests with different repartition of demands. Furthermore, the heuristics are studied when dealing with partial information about final demand. Results show that the heuristics are pertinent; they also stress the impact on performances of information acquisition.
引用
收藏
页码:403 / 424
页数:22
相关论文
共 50 条
  • [31] Single-Product Assemble-to-Order Systems with Exogenous Lead Times
    Muharremoglu, Alp
    Yang, Nan
    Geng, Xin
    OPERATIONS RESEARCH, 2024, 72 (03) : 916 - 939
  • [32] Effects of component commonality and perishability on inventory control in assemble-to-order systems
    Huang, Yeu-Shiang
    Lo, Hau-Wen
    Ho, Jyh-Wen
    OPERATIONAL RESEARCH, 2021, 21 (01) : 205 - 229
  • [33] A stochastic program based lower bound for assemble-to-order inventory systems
    Reiman, Martin I.
    Wang, Qiong
    OPERATIONS RESEARCH LETTERS, 2012, 40 (02) : 89 - 95
  • [34] Performance analysis and optimization of assemble-to-order systems with random lead times
    Song, JS
    Yao, DD
    OPERATIONS RESEARCH, 2002, 50 (05) : 889 - 903
  • [35] Demand Fulfillment in an Assemble-to-Order Production System
    Geier, Sebastian
    Fleischmann, Bernhard
    OPERATIONS RESEARCH PROCEEDINGS 2013, 2014, : 137 - 143
  • [36] GENERIC NUMBERING FOR ASSEMBLE-TO-ORDER PRODUCTS.
    Krupp, James A.G.
    Production & Inventory Management, 1984, 25 (02): : 84 - 92
  • [37] Coordination of stocking decisions in an assemble-to-order environment
    Zhang, Xiaohong
    Ou, Jihong
    Gilbert, Stephen M.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (02) : 540 - 558
  • [38] No-Holdback Allocation Rules for Continuous-Time Assemble-to-Order Systems
    Lu, Yingdong
    Song, Jing-Sheng
    Zhao, Yao
    OPERATIONS RESEARCH, 2010, 58 (03) : 691 - 705
  • [39] GENERIC BILLS OF MATERIAL IN ASSEMBLE-TO-ORDER MANUFACTURING
    VANVEEN, EA
    WORTMANN, JC
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1987, 25 (11) : 1645 - 1658
  • [40] A study on the assemble-to-order system with common component
    Zhang Yao
    Zhou Wei-hua
    GMC 13: PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON GLOBAL MANUFACTURING AND CHINA, 2013, : 1 - 5