Syntax errors in the EPC diagrams of the integrated management system documents

被引:0
|
作者
Szczesniak, Bartosz [1 ]
机构
[1] Silesian Tech Univ, Fac Org & Management, Inst Prod Engn, Ul Roosevelta 26, PL-41800 Zabrze, Poland
关键词
procedure creation; process modelling; EPC models;
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The EPC methodology enables accurate modelling of economic processes. One of the main spheres of its application is procedure creation under quality, occupational health and safety or environment management systems. The development of the methodology in question has led to establishment of precise conditions that must be conformed with in a correct process model. The main theme of the article is a general discussion of the EPC methodology. Based on an analysis of numerous literary studies published, a set of principles that should be met by an EPC diagram as a graphical representation of the process being described has been identified and discussed. Another subject touched upon in the article is the results of examinations of 156 diagrams from documents of integrated management systems implemented in two companies. The examinations conducted have implied that the diagrams created in the course of the documentation drawing up do not conform with many of the applicable requirements. The individual syntax errors occurring in the documents have been identified and discussed in the paper, and special attention has been paid to those related to application of the OR and XOR split connectors as well as those occurring when joining diagrams.
引用
收藏
页码:111 / 117
页数:7
相关论文
共 50 条
  • [31] A SYSTEM OF INTEGRATED APIARY MANAGEMENT
    COOK, VA
    BEE WORLD, 1982, 63 (02) : 60 - 62
  • [32] Integrated materials management system
    Hendrick, M
    IT AND MANUFACTURING PARTNERSHIPS: DELIVERING THE PROMISE, 1996, 7 : 173 - 181
  • [33] AN INTEGRATED MANAGEMENT-SYSTEM
    OKIN, RL
    HOSPITAL AND COMMUNITY PSYCHIATRY, 1984, 35 (01): : 106 - 106
  • [34] The Integrated Vulnerability Management System
    Watson, DP
    JOHNS HOPKINS APL TECHNICAL DIGEST, 1999, 20 (03): : 276 - 284
  • [35] THE INTELLIGENT INTEGRATED SYSTEM MANAGEMENT
    Molenda, Michal
    ECOLOGY, ECONOMICS, EDUCATION AND LEGISLATION, VOL III, 2015, : 681 - 688
  • [36] Integrated management irrigation system
    Valente, A
    Cunha, JB
    Couto, C
    COMPUTERS IN AGRICULTURE, 1998, 1998, : 54 - 60
  • [37] INTEGRATED DEPRECIATION MANAGEMENT SYSTEM
    Nechaev, Andrey S.
    Ilina, Elena A.
    SOCIAL AND CULTURAL TRANSFORMATIONS IN THE CONTEXT OF MODERN GLOBALISM (SCTCGM 2018), 2019, 58 : 728 - 734
  • [38] Integrated flood management system
    Kolovopoulos, P., 1600, (32):
  • [39] Integrated depreciation management system
    Nechaev, A.
    Rasputina, A.
    2ND INTERNATIONAL SCIENTIFIC CONFERENCE AGRIBUSINESS, ENVIRONMENTAL ENGINEERING AND BIOTECHNOLOGIES ( AGRITECH-II-2019), 2020, 421
  • [40] An integrated network management system
    Xiao, ZS
    Chen, J
    Guo, RT
    FRONTIERS OF WWW RESEARCH AND DEVELOPMENT - APWEB 2006, PROCEEDINGS, 2006, 3841 : 1193 - 1196